1.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
An employee's bonus is to be calculated. It cannot become negative, but it can be calculated to zero. The bonus is based on the duration of the employment. An employee can be employed for less than or equal to 2 years, more than 2 years but less than 5 years,5 to 10 years, or longer than 10 years. Depending on this period of employment, an employee will get either onus or a bonus of 10%, 25% or 35%.How many equivalence partitions are needed to test the calculation of the onus?
2.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the below would be the best basis for fault attack testing?
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following would be the best test approach when there are poor specifications and time pressures?
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which one of the following techniques is structure-based?
5.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
You have started specification-based testing of a program. It calculates the greatest common divisor (GCD) of two integers (A and B) greater than zero. calcGCD (A, B);
Boundary value analysis.
State transition testing.
Equivalence partitioning.
Decision table testing.
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Consider the following state transition diagram and test case table:
<br>
Which of the following statements are TRUE?
<br>
A. The test case table exercises the shortest number of transitions.
B. The test case gives only the valid state transitions.
C. The test case gives only the invalid state transitions.
D. The test case exercises the longest number of transitions.
Only A is true; B, C and D are false.
Only B is true; A, C and D are false.
A and D are true; B, C are false.
Only C is true; A, B and.
7.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following best describes the task partition between test manager and tester?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?