Introduction to Information System

Introduction to Information System

University

8 Qs

quiz-placeholder

Similar activities

Adobe Flash

Adobe Flash

University

10 Qs

IoT Local Hack Day Build 2022 Wrap Up

IoT Local Hack Day Build 2022 Wrap Up

University

7 Qs

Construct 2 Basics

Construct 2 Basics

2nd Grade - Professional Development

10 Qs

ComQuiz

ComQuiz

University

10 Qs

2018Quiz1INT202

2018Quiz1INT202

University

13 Qs

B. Com CA II Dec

B. Com CA II Dec

University

10 Qs

Kuiz Taklimat KPro bersama Pelajar Semester 1

Kuiz Taklimat KPro bersama Pelajar Semester 1

University

10 Qs

ECM3434 Business Analysis 1 - Introduction and BA techniques

ECM3434 Business Analysis 1 - Introduction and BA techniques

University

10 Qs

Introduction to Information System

Introduction to Information System

Assessment

Quiz

Computers

University

Hard

Created by

Tihah MNoor

Used 14+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the correct statement about information system.

It collects information, stores and manipulates it into raw facts.

It can exist in the form of text, numbers, images, audio and video.

A collection of facts that is meaningfully organized and useful to their users in completing their tasks.

A system that comprises a set of interrelated elements that transform data into information.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The X paradigm was used to portray a hierarchy utilized in information system. The X paradigm is:

DIKW (Data, Information, Knowledge, Wisdom)

DIKW (Data, Information, Knowledge, Wise)

DIKW (Data, Intelligence, Knowledgeable, Wisdom)

DIKW (Data, Intelligence, Knowledgeable, Wise)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The THREE basic steps of software reuse are:

Abstraction, storage and recontextualization

Abstraction, storage and reconceptualization

Ad hoc, facilitated and managed

Ad hoc, managed and designed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

__________ is a Project Management process, in which activities are deployed to assess the size, scope and complexity of the project.

Executing

Closing down

Initiating

Planning

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Criteria to consider of choosing off-the-shelf software are as below except:

Documentation

Cost

Functionality

Cloud services

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Why do we need effective project management?

To build wisdom

To satisfy the customers

To avoid crisis

To save time

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Reasons the project failure:

i) people

ii) organization

iii) charter

iv) process

i) and ii)

i, ii and iii)

i), ii) and iv)

All of the above

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In project management processes or PLC, where is the SDLC started to involve?

Initiating the project

Planning the project

Execution of the project

Closing down the project