MYCESMM2 - CLASS E & F

MYCESMM2 - CLASS E & F

University

14 Qs

quiz-placeholder

Similar activities

Alphabet of Lines & Line Weights

Alphabet of Lines & Line Weights

University

15 Qs

Cost Estimating Theory

Cost Estimating Theory

12th Grade - University

16 Qs

FD SET 3

FD SET 3

University

10 Qs

Embodied Energy in Construction

Embodied Energy in Construction

University

12 Qs

APC 13 VIDEO Los enigmáticos atlantes

APC 13 VIDEO Los enigmáticos atlantes

University

15 Qs

Infraestrutura Urbana - Aula 4

Infraestrutura Urbana - Aula 4

University

11 Qs

Materiales de construcción Quizz inicial

Materiales de construcción Quizz inicial

University

10 Qs

Arsitektur Modern (LC dan FLW) dan Critical Regionalism

Arsitektur Modern (LC dan FLW) dan Critical Regionalism

University

15 Qs

MYCESMM2 - CLASS E & F

MYCESMM2 - CLASS E & F

Assessment

Quiz

Architecture

University

Practice Problem

Medium

Created by

DR IDA

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

CLASS E in MYCESSM2 refers to Demolition and Site Clearance.

TRUE

FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Water bodies shall consist of, but not limited to, rivers, lake and sea, unless expressly required.

This Definition rules refers to ....

E110, D1

E120, D3

E100, D3

E120, D4

3.

DRAG AND DROP QUESTION

1 min • 1 pt

The project site clearance include 20 nos between 2.0 - 3.0 m girth of tree.

Choose the suitable code of MYCESMM2 for this activities. ​ ​

​ ​ (a)  

E230
E210
E220
E240

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The below rules applied to E311 EXCEPT

D5

D6

A5

A7

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For Code E800, the additional rules applied is

A1

A2

A3

No Additional Rules Applied

6.

DRAG AND DROP QUESTION

1 min • 1 pt

Construction Activities ; Stripping of top soil is under MYCESMM2 Class ​ ​ (a)   ​ (b)  

F
111
E
R
H
110
100

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Excavation to remove Unsuitable Material refers to below EXCEPT

stumps

large amounts of roots and grass

earth

rubbish

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?