QUIZ 2 URBAN INFRASTRUCTURE

QUIZ 2 URBAN INFRASTRUCTURE

8th Grade

10 Qs

quiz-placeholder

Similar activities

Waste Water Management

Waste Water Management

7th Grade - University

15 Qs

Waste Water

Waste Water

7th Grade - University

15 Qs

Wastewater Story

Wastewater Story

7th - 8th Grade

15 Qs

FOG (Fats Oils and Grease)

FOG (Fats Oils and Grease)

4th - 8th Grade

11 Qs

Waste Water Treatment

Waste Water Treatment

7th Grade - University

15 Qs

Wastewater Treatment

Wastewater Treatment

8th Grade

10 Qs

Waste Water Treatment

Waste Water Treatment

7th Grade - University

15 Qs

Waste Water Sewage Treatment

Waste Water Sewage Treatment

7th Grade - University

15 Qs

QUIZ 2 URBAN INFRASTRUCTURE

QUIZ 2 URBAN INFRASTRUCTURE

Assessment

Quiz

Science

8th Grade

Hard

NGSS
MS-ESS2-4, HS-ETS1-1, MS-ETS1-1

+3

Standards-aligned

Created by

RAHIMAH EMBONG

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below are the role of sewerage system EXCEPT:

Reduction of greenhouse gasses emissions

Collect and treat sanitary wastewater from domestic and industrial sources and drain storm water

Sustainable Urban Development

Reduction of rainwater in drainage system

Tags

NGSS.MS-ESS2-4

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below are the components of sewerage system EXCEPT:

Collection of Domestic Sanitary Wastewater

Separate sewer system

Combined sewer system

Individual Sewer system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Separate system are where sanitary wastewater and storm water run into separate sewer lines.

Yes

No

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The installation cost of a combined system is higher than that of separate system

Yes

No

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the main role of Prefecture Sewerage?

Received wastewater from two or more municipalities and transport it to WWTPs for treatment

Collect wastewater with their sewer network that connects the manholes to trunk sewer

Treat Wastewater

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below are the process of creating a master plan for sewerage system EXCEPT:

Formulation of basic policy

data collection

Analysis

Observation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Feasibility of meeting the goals needs to be studied to identify what obstacles exist or will appear in the future. Statement above represent:

Data collection

Prediction

Analysis

Formulation of Basic policy

Tags

NGSS.HS-ETS1-1

NGSS.HS-ETS1-3

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?