
GMJ 9189 Phase 1 Unit 309
Authored by Glen Johnson
Other
Professional Development
Used 90+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
21 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where are the statutory requirements for the installation of drainage systems?
BS 6700
BS EN 12056
Building regulations
WRAS
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify this type of stack system.
Primary ventilated stack
Secondary ventilated stack
Ventilated discharge branch stack
Stub stack
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If a discharge branch has a gradient of 18mm per metre and the branch is 3 metres in length, what will the vertical drop distance be?
54mm
18mm
36mm
72mm
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the component shown, when installed at the base of the stack?
To prevent evaporation
To prevent backflow
To prevent expansion
To prevent compression
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The maximum recommended length of a discharge pipe from a bath connected to a primary ventilated stack is:
3 metres
4 metres
5 metres
6 metres
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the recommended termination, as per building regulations, for a soil stack inside a building?
Open ended
Cowl
Domical cage
Air admittance valve
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum sized waste that is allowed to be fitted to a wash basin?
32mm
40mm
50mm
110mm
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?