Slide 81-90

Slide 81-90

University

18 Qs

quiz-placeholder

Similar activities

GIS Spatial Data Models

GIS Spatial Data Models

University

15 Qs

икт 21-40

икт 21-40

1st Grade - University

20 Qs

Unit 2 - Abstraction and Automation

Unit 2 - Abstraction and Automation

12th Grade - University

14 Qs

ICOM QUIZ#2

ICOM QUIZ#2

University

15 Qs

GDSC Intro Quiz

GDSC Intro Quiz

University

15 Qs

CAP3

CAP3

University - Professional Development

20 Qs

Unit-1|Basics of Computer Networks

Unit-1|Basics of Computer Networks

University

20 Qs

2.1(a)(b)(c) - Lecture

2.1(a)(b)(c) - Lecture

University

20 Qs

Slide 81-90

Slide 81-90

Assessment

Quiz

Computers

University

Practice Problem

Medium

Created by

GABRIELLE GAMBOA

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The ___ ___ is the cabling and pathways outside of the building and carries telecommunication services to the building.

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The interbuilding backbone is the cabling and pathways outside of the building and carries telecommunication services to the building, which includes:

cables carrying local exchange carrier (LEC) services

Internet service provider services

Private branch exchange (PBX) telecommunication cable

backbone pathway/cabling

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The building entrance facility is an entrance to the building for both ___ and ___ network service cables. (ANS ; ANS)

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The building entrance facility includes

cables

connecting hardware

protection devices

other equipment needed to connect the interbuilding backbone cabling to the backbone cabling in the building

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

In buildings with a finished floor area larger than ____, a secured (locked), dedicated, enclosed room is recommended for the building entrance.

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

An industry standard is to allow ___ of 3/4 in. (20-mm) plywood wall-mount area for each 200ft^2 (19m^2) area of finished floor area.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Serves a building or multiple building in a ____ or ____ ____ rk environment and the building entrance facilities.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?