Building Envelope System

Building Envelope System

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

Timing Gear, Chain, and Belt removal and installation

Timing Gear, Chain, and Belt removal and installation

12th Grade

15 Qs

House Construction Process Quiz

House Construction Process Quiz

9th Grade

10 Qs

Logos de Informática

Logos de Informática

9th Grade

20 Qs

PC Pro 7.0 Lesson 8.3 "Remote Services"

PC Pro 7.0 Lesson 8.3 "Remote Services"

12th Grade

11 Qs

ADMINISTRASI SISTEM JARINGAN

ADMINISTRASI SISTEM JARINGAN

11th Grade

20 Qs

IT Practice Test 2

IT Practice Test 2

9th - 10th Grade

10 Qs

M6 Wall Systems Trade Terms  (16)

M6 Wall Systems Trade Terms (16)

9th - 12th Grade

16 Qs

Data Integrity and Security Review

Data Integrity and Security Review

11th Grade

10 Qs

Building Envelope System

Building Envelope System

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Created by

Reid Chapman

Used 21+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installing windows and exterior doors in a house is the final step in?

finishing

thermal protection

drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing?

building paper

polypropylene film

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing building wrap on a structure, all overlaps should be?

3" to 6"

6" to 12"

12" to 18"

18" to 24"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is?

36"

40"

44"

48"

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nailing flanges are not found on the outside of?

wood windows

metal windows

vinyl-clad wood windows

vinyl windows

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When checking a window opening for squareness, you would use a?

combination square

plumb bob

framing square

laser level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be?

1/8" to 1/4"

1/4" to 1/2"

5/16" to 5/8"

5/8" to 3/4"

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?