Building Envelope System

Building Envelope System

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

Edible water Bottle

Edible water Bottle

KG - Professional Development

10 Qs

Introduction to STREAM

Introduction to STREAM

11th Grade

10 Qs

Tapping and Threading

Tapping and Threading

12th Grade - Professional Development

10 Qs

North Africa

North Africa

7th - 9th Grade

10 Qs

HEAT AND TEMPERATURE

HEAT AND TEMPERATURE

1st Grade - University

11 Qs

Presentador Prezi

Presentador Prezi

10th Grade

16 Qs

Mit App Inventor

Mit App Inventor

11th Grade

12 Qs

LINK TEST - KHỞI ĐỘNG

LINK TEST - KHỞI ĐỘNG

6th - 12th Grade

20 Qs

Building Envelope System

Building Envelope System

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Practice Problem

Medium

Created by

Reid Chapman

Used 22+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installing windows and exterior doors in a house is the final step in?

finishing

thermal protection

drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing?

building paper

polypropylene film

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing building wrap on a structure, all overlaps should be?

3" to 6"

6" to 12"

12" to 18"

18" to 24"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is?

36"

40"

44"

48"

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nailing flanges are not found on the outside of?

wood windows

metal windows

vinyl-clad wood windows

vinyl windows

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When checking a window opening for squareness, you would use a?

combination square

plumb bob

framing square

laser level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be?

1/8" to 1/4"

1/4" to 1/2"

5/16" to 5/8"

5/8" to 3/4"

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?