14 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An Arc Flash/Arc Blast temperatures can reach as high as 35,000°F
True
False
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Is the ground-fault circuit interrupters designed to protect people from electrical shock or the equipment from burning up?
People
Equipment
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
This is the preferred order of controlling hazards, or “hierarchy of controls,” for hazardous materials: Administrative Controls, Engineering Controls, Elimination, PPE
True
False
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Class E hard hats are designed for electrical/utility work. They protect against falling objects and provide protection against conductors with higher voltage levels and proof-tested at 68,000 volts.
True
False
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Safety glasses and Face protection must meet the requirements of ANZI Z87.1.
True
Flase
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To access a scaffold, it is permitted to use cross braces or unapproved ladder-like ends for access.
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If the front edge (working edge) of a scaffold is more than 14 inches from the work, guardrails and/or PFAS systems must be used.
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?