PROFESSIONAL PRACTICE

PROFESSIONAL PRACTICE

University

61 Qs

quiz-placeholder

Similar activities

AOS_EXAM_2025_REVIEW

AOS_EXAM_2025_REVIEW

University

58 Qs

STREMA PART 1

STREMA PART 1

University

66 Qs

Steel and Timber

Steel and Timber

University

60 Qs

ICA - AREA A (SET 1 REVIEW)

ICA - AREA A (SET 1 REVIEW)

University

57 Qs

Utilities 3 (CTTO)

Utilities 3 (CTTO)

University

56 Qs

VDA - Light (Part 3/3)

VDA - Light (Part 3/3)

University

57 Qs

ALE 2024 DAY 1 AM

ALE 2024 DAY 1 AM

University

65 Qs

Greek Architecture Review

Greek Architecture Review

University

60 Qs

PROFESSIONAL PRACTICE

PROFESSIONAL PRACTICE

Assessment

Quiz

Architecture

University

Practice Problem

Easy

Created by

unknown user

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

61 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

SPP Document 203 replaced what document?

1979 UAP DOC 203

1976 UAP DOC 203

1969 UAP DOC 203

1967 UAP DOC 203

2.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Which of the following do not fall in specialized allied services- design services?

Facilities Maintenance Support

Site and Physical Planning Services

Plumbing Systems Design

Contract Documentation and Review

3.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

_____ deals with specific expertise for further enhancement of the architectural interior and exterior components of a project.

Pre-design services

Specialized Allied Services

Architect

Consultant

4.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

What is SPP Document 203?

1979 UAP DOC 203

Specialized Allied Services

Pre-design Services

Regular Design Services

5.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Which of the following is not performed by the specialist architect?

prescribes space plans, stacking diagrams/sections and computations of areas for the

different activities and spaces to be integrated in a building Project.

conceptualizes the specifications for the needed civil works and utility lines.

lays out and prescribes furniture / built-ins / equipment for the project and prepares

specifications of AI components including all floor / wall / ceiling finishes, doors and partition

systems, hardware, modular or ready-assembled furniture pieces/ systems, equipment,

furnishings, built-ins, fixtures, signages and graphic devices, etc.

assists the Client in conducting bids or negotiations with General Contractors,

sub-contractors and suppliers of building materials, furniture, equipment, fixtures, etc.

6.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

In SPP document 203, _____may also be defined as the blending of aesthetics, functions, space, materials, and the environment resulting from the application of various technologies and skills in different fields.

Interior Designer

Architect

Contractor

Engineer

7.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

____ Involves the detailed planning and design of the indoor/enclosed areas of any proposed building/structure including retrofit, renovation, rehabilitation, or expansion work which shall cover all architectural and utility aspects. Including the architectural lay outing of all building engineering systems found therein.

Comprehensive Development Planning

Architectural Lighting and Design

Preliminary Services

Architectural Interiors

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?