CMA 490 Exam 2 Review- Chapters 4-6

CMA 490 Exam 2 Review- Chapters 4-6

University

79 Qs

quiz-placeholder

Similar activities

CPNS

CPNS

University

80 Qs

THEORY OF ARCHITECTURE

THEORY OF ARCHITECTURE

University

75 Qs

ULTIMATE SPP QUIIZ

ULTIMATE SPP QUIIZ

University

76 Qs

EA 1.2 Componentes de un sistema de control 1-7a

EA 1.2 Componentes de un sistema de control 1-7a

University

75 Qs

CMA 490 Exam 2 Review- Chapters 4-6

CMA 490 Exam 2 Review- Chapters 4-6

Assessment

Quiz

Architecture

University

Practice Problem

Easy

Created by

Jeremiah Arnett

Used 69+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

79 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

From a project management and scheduling perspective, the challenge of completing a project is maximizing resources without ___.

compromising any project goals

the use of multiple subcontractors

overloading activity schedules

going overbudget

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

___ is the set of financial assets needed to complete a construction project.

Profit

Escrow

Supply

Capital

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The planning of a project begins by developing a(n) ___ and identifying the activities that are required to complete the project.

employee list

work breakdown structure (WBS)

financial bid

critical path (CP)

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ schedule is a schedule in which the resources for a project are assigned to activities so that the activities can be closely monitored.

activity-loaded

X-day

resource-loaded

breakdown

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ___ process involves ensuring that resources have the expertise required by checking bonding information, past projects, and references.

prequalification

research

cataloging

bidding

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A ___ constraint is a limitation in which one activity cannot occur until another activity is completed or, in some cases, near completion.

technical

time

resource

physical

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An example of resolving a technical constraint is dividing the floor and the corresponding walls of a building into quadrants based on ___.

compass directions (NE, NW, SE, SW)

size (6 ft, 8 ft, 10 ft, etc.)

building level (1st floor, 2nd floor, etc.)

room type (common room, bathroom, kitchen, etc.)

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Similar Resources on Wayground