CMT 210 Chapter 3-4

CMT 210 Chapter 3-4

University

20 Qs

quiz-placeholder

Similar activities

QUIZ 1 : TOPIC 11 [INCOMPLETE RECORDS AND SINGLE ENTRY]

QUIZ 1 : TOPIC 11 [INCOMPLETE RECORDS AND SINGLE ENTRY]

1st Grade - University

15 Qs

Test Pengetahuan Agama Islam

Test Pengetahuan Agama Islam

6th Grade - University

20 Qs

Understanding Data and Ways on How to Collect Data

Understanding Data and Ways on How to Collect Data

11th Grade - University

15 Qs

UTS Statistik Psikologi

UTS Statistik Psikologi

University

15 Qs

Drawings

Drawings

KG - Professional Development

20 Qs

CMT 210 QUIZ

CMT 210 QUIZ

University

23 Qs

Afkar. Kitab Risalah Ahlussunnah. UTS

Afkar. Kitab Risalah Ahlussunnah. UTS

University

20 Qs

Quiz Aqidah Islamiyyah

Quiz Aqidah Islamiyyah

University

15 Qs

CMT 210 Chapter 3-4

CMT 210 Chapter 3-4

Assessment

Quiz

Education

University

Easy

Created by

Lil Sway

Used 5+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Product data submittals, samples, and _____________are required primarily for the architect and engineer to verify that the correct products will be installed on the project.

submittals

shop drawings

bid forms

addenda

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

samples should be stored at the jobsite and compared to

schedule

samples

materials delivered

jobsite layout

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

size and physical characteristics should be reviewed by both the contractors and the

owner

contractor

engineer

architect

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

the project manual typically includes

supplier

bid forms

materials

samples

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

the __________ are the base of reference for determining responsibility and liability for actions by the owner and contractor during the project period.

conditions of contract

labor agreement

mediation

none of the above

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

the design for construction projects is typically developed by the contractor and the architect. T/F

true

false

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

a ___________ is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator

materials

samples

shop drawing

bid forms

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?