Search Header Logo

GMJ 6035 central heating 1

Authored by Glen Johnson

Other

Professional Development

Used 168+ times

GMJ 6035 central heating 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Delta T

Weight of the cistern

The pump speed

Room temperature divided by boiler temperature

The difference between the temperature of the radiator and the room

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which radiator is a double panel double convector

Media Image
Media Image
Media Image
Media Image

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the neutral point

At the edge of the Klingon empire

Where the open vent connects to the circuit

Where the primary flow becomes the return

Where the cold feed connects to the circuit

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main problem with the one pipe system is that

They are prone to blockages

They can't be used in a bungalow

They are expensive to run

The earlier radiators pass cooler water back into the circuit

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The cold water supply to a fully pumped open vented central heating system should be

isolated at the

stop valve to the incoming cold water supply pipework

Gate valve on the cold feed pipework from the F & E cistern

service valve to the float operated valve to the CWS cistern

service valve to the float operated valve to the F & E cistern.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The cold water supply to a fully pumped open vented central heating system should be

isolated at the

stop valve to the incoming cold water supply pipework

Gate valve on the cold feed pipework from the F & E cistern

service valve to the float operated valve to the CWS cistern

service valve to the float operated valve to the F & E cistern.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When setting the water level in a feed and expansion cistern, the allowance that should be

made for the expansion of water in the heating system is

4 %

6 %

10 %

1600 times its volume

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?