Electrical Principles 6035-02 | Revision

Electrical Principles 6035-02 | Revision

Professional Development

42 Qs

quiz-placeholder

Similar activities

Initial Verification of Electrical Installations V1.2 June 2022

Initial Verification of Electrical Installations V1.2 June 2022

Professional Development

40 Qs

Electrician 4th Sem Module 2 Control Panel Wiring

Electrician 4th Sem Module 2 Control Panel Wiring

Professional Development

37 Qs

MEM BW Pre - Evaluation

MEM BW Pre - Evaluation

Professional Development

40 Qs

ONLINE TEST TECHNICIAN

ONLINE TEST TECHNICIAN

Professional Development

43 Qs

Basic Electric

Basic Electric

Professional Development

40 Qs

Electrical Principles 6035-02 | Part 1

Electrical Principles 6035-02 | Part 1

Professional Development

40 Qs

Final Quiz E03 EII

Final Quiz E03 EII

Professional Development

40 Qs

Periodic Inspection and Testing of Electrical Installations

Periodic Inspection and Testing of Electrical Installations

Professional Development

40 Qs

Electrical Principles 6035-02 | Revision

Electrical Principles 6035-02 | Revision

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 167+ times

FREE Resource

42 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When pulling a plug from a socket, what is the last point of contact between plug and socket?

The earth terminal

The fuse

The live terminal

The neutral terminal

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The domestic voltage is 230v, but what would be the low-voltage on a central heating system?

110v

24v

400v

240v

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a circuit was to overload, what would be the first to damage?

The appliance

The fuse

The sleeve

The insulation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1) Make sure it is ok to disconnect the supply.

2) Identify the source for the supply.

3) Go back to appliance and prove appliance is dead

4) Test the voltage indicator on a known source.

5) Switch off MCB/remove fuse, lock and label.

Select the correct sequence.

4, 2, 5, 3, 1, 4

1, 4, 5, 3, 2, 1

1, 2, 4, 5, 3, 4

2, 5, 4, 1, 3, 4

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the component show?

Manometer

Multimeter

Approved voltage indicator

Continuity tester

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When there is a problem with the circuit, what would your first action be?

Isolate, rectify problem

Inform customer, isolate

Inform customer, rectify problem

Identify, prove circuit is dead

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the component circled?

Incoming mains

Consumer unit

Meter

Main earth bar

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?