Construction industry 2023 A

Construction industry 2023 A

University

22 Qs

quiz-placeholder

Similar activities

The secret garden

The secret garden

12th Grade - Professional Development

17 Qs

RA 9514 - Fire Code of the Philippines

RA 9514 - Fire Code of the Philippines

University

21 Qs

CONSTRUCTION PRE-PLANNING QUIZ

CONSTRUCTION PRE-PLANNING QUIZ

University

20 Qs

BUILDING UTILITIES PART 4_ACOUSTICS & ILLUMINATION

BUILDING UTILITIES PART 4_ACOUSTICS & ILLUMINATION

University

20 Qs

BUILDING UTILITES 2 FINAL EXAM

BUILDING UTILITES 2 FINAL EXAM

University

20 Qs

Greek & Roman Architecture

Greek & Roman Architecture

KG - Professional Development

20 Qs

Pritzker Prize Laureates 2017-2021

Pritzker Prize Laureates 2017-2021

University

20 Qs

Kanjis for Beginners

Kanjis for Beginners

1st Grade - University

20 Qs

Construction industry 2023 A

Construction industry 2023 A

Assessment

Quiz

Architecture

University

Practice Problem

Medium

Created by

Димон Димон

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to recycle or reuse materials?

To conserve the appearance of the project

To conserve natural resources

To save on cost of disposal of material

To save on the cost of the project being carried out

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a benefit of just in time delivery

Less chance of damage to items sitting around in storage

Reduce labour costs

Higher quality materials

Reduction it materials going to landfill

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Timber framed panels made off site are classed as

Prefabricated

Site fabricated

Moulded

Pre-cast

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a benefit of using BIM on a project

It supports extra payments through rework

It supports early identification of issues

It allows contractors to undercut each other on price

It helps delay payments to contractors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

hen producing CAD drawings on a computer what is the most important precaution that should be taken?

That the user saves the data to the computer.

That the computer data is backed up to a separate source

 

That the user prints out a hard copy in case of lost data.

That the specification of the computer exceeds the program requirements.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would you consider the use of during sustainable design of a modern building?

Alternative energies and insulation

Alternative energies and fossil fuels

Fossil fuels and insulation

Alternative energies, fossil fuels and insulation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Sustainable design and construction aims to

Reduce overall energy use and maximise the use of materials from unsustainable sources

Reduce overall energy use and minimise material transport cost

Reduce energy use during the construction process.

Reduce overall energy use and maximise the use of materials from sustainable sources

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?