Search Header Logo

Construction 4

Authored by paul martin

Instructional Technology

11th Grade

Used 5+ times

Construction 4
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A direct cold water system is feed from what ?

From a tank in the roof space

An underground water harvest system

A cold water main

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An indirect cold water system is feed from what ?

From the cold water main 

From a tank in the roof space

An underground water harvest system 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A combination boiler is a direct water system appliance ?

True 

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The water stored in a tank in the roof space is classed as ?

Non Drinkable 

Waste water 

Wholesome water 

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An indirect hot water tank is feed from what ?

A tank in the roof space

The cold water main

A rain water harvest system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Is it acceptable to use lead pipework for cold water supplies ?

Yes

No

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If terminating rain water guttering into a foul drain system. It must be ?

Trapped 

Not allowed

Checked by the council 

Allowed with customers permission

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?