Search Header Logo

Construction 4

Authored by paul martin

Instructional Technology

11th Grade

Used 5+ times

Construction 4
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A direct cold water system is feed from what ?

From a tank in the roof space

An underground water harvest system

A cold water main

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An indirect cold water system is feed from what ?

From the cold water main 

From a tank in the roof space

An underground water harvest system 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A combination boiler is a direct water system appliance ?

True 

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The water stored in a tank in the roof space is classed as ?

Non Drinkable 

Waste water 

Wholesome water 

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An indirect hot water tank is feed from what ?

A tank in the roof space

The cold water main

A rain water harvest system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Is it acceptable to use lead pipework for cold water supplies ?

Yes

No

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If terminating rain water guttering into a foul drain system. It must be ?

Trapped 

Not allowed

Checked by the council 

Allowed with customers permission

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?