Lockout Tagout

Lockout Tagout

Professional Development

10 Qs

quiz-placeholder

Similar activities

TPM - 6S

TPM - 6S

Professional Development

10 Qs

Construction Safety_2

Construction Safety_2

Professional Development

10 Qs

LOTO

LOTO

Professional Development

7 Qs

Golden Rules 1 - 3

Golden Rules 1 - 3

Professional Development

15 Qs

Grand Meeting Agustus 2022

Grand Meeting Agustus 2022

Professional Development

10 Qs

Cyber Safety And Ethics

Cyber Safety And Ethics

KG - Professional Development

8 Qs

Pneumatic Troubleshooting Mod 1 Introduction

Pneumatic Troubleshooting Mod 1 Introduction

Professional Development

11 Qs

LOTO Quiz

LOTO Quiz

Professional Development

10 Qs

Lockout Tagout

Lockout Tagout

Assessment

Quiz

Other

Professional Development

Medium

Created by

Syahidah Kamjah

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is unnecessary for a company to have written procedures for proper lockout/tagout.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a safety device is removed from a piece of equipment, lockout/tagout
required

True

False

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Please select the correct answer

Blue Padlock for equipment

Purple Padlock for vendor

Yellow padlock is for equipment owner

Red padlock is for contractor coordinator

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Five employees performing maintenance on a machine and only two of them having locks and tags applied.

Violation

Compliance

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Authorized employee responsibilities are...

Remove LOTO device from affected machines & process piping.

Prepare for shutdown of machine & update LOTO log.

Verify that the machine or equipment is ready for normal operation.

Notify affected employees that LOTO & line-breaking activities will occur.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Following LOTO device is known as...

Lockbox

Hasplock

Ball valve lockout

Plug lockout

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

is required for each applicable machine, equipment and process piping.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?