1.

REORDER QUESTION

1 min • 1 pt

When completing the PDI on air conditioning systems, after safe work practices, what is the correct order of the steps?

Check for air flow - cooler then ambient temperature through all A/C outlet

Locate the thermostat for the A/C unit and set to lowest setting

plug RV into external 120V AC source

Complete documentation on the test, including all recommended repairs and appropriate record-keeping and warranty forms

document ducted air conditioning manufacturer, model number, and serial number and all actions taken on PDI form

2.

REORDER QUESTION

1 min • 1 pt

When completing PDI on the refrigerator, what are the first steps (after safe work practices and documentation)?

switch source mode to propane (set to lowest setting); verify refrigerator maintains cool on propane power source

plug RV into external 120V AC source

verify propane in container

energize refrigerator from AC power source (set to lowest setting); verify refrigerator cools on AC power source

switch source mode to low voltage (set to lowest setting); verify refrigerator remains cool on low voltage power sources

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When conducting the refrigerator PDI, which step MAY be optional?

AC mode

low voltage mode

propane mode

shore power

4.

REORDER QUESTION

1 min • 1 pt

What is the correct order of tasks when completing the furnace PDI?

locate thermostat for furnace and set to highest setting

verify propane in container

safe work practices and documentation of appliance

document actions taken, record-keeping, and warranty forms

check for air flow (warmer, then ambient temperature) through all furnace outlets

5.

REORDER QUESTION

1 min • 1 pt

After completing safe work practices and documentation, what is the correct order of tasks for completing the water heater PDI on a standard RV?

switch to AC mode, then inspect coolant hose connections

fill water heater

complete documentation

plug RV into external 120V AC source and verify propane in container

ignite water heater on gas

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct order of steps for filling the water heater?

Open pressure and temperature relief valve on water heater; turn on water source; close faucet inside RV; verify water heater is filled

Turn on water source; close faucet inside RV; open hot water faucet; verify water heater is filled

Open hot water faucet; close relief valve; turn on water source; verify water heater is filled

verify water heater is filled; turn on water source; open hot water faucet; open pressure and temperature relief valve on water heater; when water starts to come out of P&T valve, close relief valve; close faucet inside RV

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the correct order of steps for completing PDI on a tankless water heater.

ignite source; document make/model/serial number; document actions, etc.; verify propane in container

document make/model/serial number; document actions, etc.; ignite source; verify propane in container

verify propane in container; ignite source; document make/model/serial number; document actions, etc.

document make/model/serial number; verify propane in container; ignite source; document actions, etc.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?