1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The terminal end of the drain for a pressure-relief valve shall not be:
Painted
Reamed
Threaded
Open
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The building sewer shall be determined on the basis of the total number of fixture units drained by such sewer in accordance with:
None of the above
The maximum fixture load only
The same table(s) as the buildi
Table 7-8 fixture unit loading
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The exit terminals of mechanical drain systems shall be:
In the same story
Not over 10 feet from the vent
Not less than 7 feet above grade
Not over 20 feet from the vent
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The developed length of 1-1/2-inch trap arms shall not exceed:
2 feet, 8 inches
5 feet
6 feet
3 feet, 6 inches
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The minimum common horizontal waste pipe serving a bathtub, a lavatory, and a kitchen sink shall be at least:
3 inches
1-1/2 inches
2-1/2 inches
2 inches
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The minimum size trap and trap arm for a kitchen sink is:
1-1/2 inches
2 inches
3 inches
2-1/2 inches
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The required clearance in front of a 3-inch cleanout is:
6 inches
18 inches
12 inches
24 inches
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?