Wind Project Life Cycle

Wind Project Life Cycle

University

11 Qs

quiz-placeholder

Similar activities

Accounting for Franchise

Accounting for Franchise

University

10 Qs

Revisão

Revisão

12th Grade - Professional Development

7 Qs

peraturan perundangan lingkungan hidup

peraturan perundangan lingkungan hidup

University

16 Qs

Seminar EE Di Politeknik KB 15 Jun 2022

Seminar EE Di Politeknik KB 15 Jun 2022

1st Grade - University

14 Qs

Capacitação_Controle_Aula_5

Capacitação_Controle_Aula_5

University

10 Qs

BTE Earth Month 2025

BTE Earth Month 2025

University

13 Qs

Wind Project Life Cycle

Wind Project Life Cycle

Assessment

Quiz

Professional Development

University

Medium

Created by

Sivakumar V

Used 2+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A wind farm has a lifespan of ___ - ____ years that starts with development and goes through construction, operation and ends with decommissioning or occasionally repowering

10-20

20-30

30-40

40-50

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Repowering means....

replacing old WPPs with newer ones

Commissioning a new power plant

Discarding a old power plant

Servicing a power plant

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site feasibility study, Permissions and Procurement, Installation and Commissioning of WPP's consuming

less than 3 months

3 - 6 months

6 - 9 months

9 - 12 months

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

•A ___MW turbine requires a crane with capacity to lift ___ tons for hoisting the tower sections nacelle and rotor into position.

2 MW, 500 tons

1 MW, 500 tons

2 MW, 600 tons

1 MW, 600 tons

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The top of the turbine structure of WPP

Nacelle

rotor

the generator, gearbox, control systems

nacelle and the rotor assembly

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rotor assembly consists of

blades and hub

the generator, gearbox, control systems,

the generator, and gearbox

the generator, gearbox, blades,

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SCADA system means

Superior Control and Data Acquisition

Surplus Control and Data Acquisition

Supervisory Control and Data Assessment

Supervisory Control and Data Acquisition

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?