1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A wind farm has a lifespan of ___ - ____ years that starts with development and goes through construction, operation and ends with decommissioning or occasionally repowering
10-20
20-30
30-40
40-50
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Repowering means....
replacing old WPPs with newer ones
Commissioning a new power plant
Discarding a old power plant
Servicing a power plant
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Site feasibility study, Permissions and Procurement, Installation and Commissioning of WPP's consuming
less than 3 months
3 - 6 months
6 - 9 months
9 - 12 months
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
•A ___MW turbine requires a crane with capacity to lift ___ tons for hoisting the tower sections nacelle and rotor into position.
2 MW, 500 tons
1 MW, 500 tons
2 MW, 600 tons
1 MW, 600 tons
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The top of the turbine structure of WPP
Nacelle
rotor
the generator, gearbox, control systems
nacelle and the rotor assembly
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Rotor assembly consists of
blades and hub
the generator, gearbox, control systems,
the generator, and gearbox
the generator, gearbox, blades,
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
SCADA system means
Superior Control and Data Acquisition
Surplus Control and Data Acquisition
Supervisory Control and Data Assessment
Supervisory Control and Data Acquisition
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?