Wind Project Life Cycle

Wind Project Life Cycle

University

11 Qs

quiz-placeholder

Similar activities

SPED 402 Review for 10/10/18

SPED 402 Review for 10/10/18

University

12 Qs

1° INTEGRACIÓN DE LAS ENERGÍAS RENOVABLES

1° INTEGRACIÓN DE LAS ENERGÍAS RENOVABLES

University

12 Qs

Soren Chemicals

Soren Chemicals

University

10 Qs

2 SRM

2 SRM

University

9 Qs

Uji  Limnologi BAB 6

Uji Limnologi BAB 6

University

9 Qs

Transport Quiz 2

Transport Quiz 2

University

12 Qs

Multifunction steering wheel

Multifunction steering wheel

KG - Professional Development

10 Qs

Wind Project Life Cycle

Wind Project Life Cycle

Assessment

Quiz

Professional Development

University

Practice Problem

Medium

Created by

Sivakumar V

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A wind farm has a lifespan of ___ - ____ years that starts with development and goes through construction, operation and ends with decommissioning or occasionally repowering

10-20

20-30

30-40

40-50

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Repowering means....

replacing old WPPs with newer ones

Commissioning a new power plant

Discarding a old power plant

Servicing a power plant

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site feasibility study, Permissions and Procurement, Installation and Commissioning of WPP's consuming

less than 3 months

3 - 6 months

6 - 9 months

9 - 12 months

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

•A ___MW turbine requires a crane with capacity to lift ___ tons for hoisting the tower sections nacelle and rotor into position.

2 MW, 500 tons

1 MW, 500 tons

2 MW, 600 tons

1 MW, 600 tons

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The top of the turbine structure of WPP

Nacelle

rotor

the generator, gearbox, control systems

nacelle and the rotor assembly

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rotor assembly consists of

blades and hub

the generator, gearbox, control systems,

the generator, and gearbox

the generator, gearbox, blades,

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SCADA system means

Superior Control and Data Acquisition

Surplus Control and Data Acquisition

Supervisory Control and Data Assessment

Supervisory Control and Data Acquisition

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?