FANUC Review

FANUC Review

University

89 Qs

quiz-placeholder

Similar activities

!PS3c

!PS3c

University

91 Qs

Private Pilot Training - Module 2

Private Pilot Training - Module 2

9th Grade - Professional Development

84 Qs

Aviation Regulations Final

Aviation Regulations Final

University

85 Qs

NCSI Study Practice Quiz

NCSI Study Practice Quiz

University

87 Qs

CĐ 4.1: Tắc ruột

CĐ 4.1: Tắc ruột

University

85 Qs

FANUC Review

FANUC Review

Assessment

Quiz

Specialty

University

Hard

Created by

Oscar Castillo

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

89 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Turning the teach pendent on:

Activates the default program
Enables Communication with External Devices
Gives motion control soley to the operator via the TP
Energizes robotic arm

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

How many jog frames are standard on the R-J3 series controller?

5
2
3
4

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What are the 3 methods used to define a tool frame.

4, 3, and six point method
3, 6, and direct entry method
2, 4, and 6 point method
2, 3, and direct entry

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is the default location of the tool center point?

at the center of the faceplate
the center of the user frame
the job frame
the center of the robot

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What are the three methods used to define a RTCP frame?

2 and 6 point method
3 and 7 point method
3 point, 4 point and direct entry method
all of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

How many user frames are standard on the R-J3 series controller?

13
9
8
11

7.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

The status line describes the current status of the I/O. When the status displays PENDING, this means:

an assignment has not been made
the assignment is valid, but not active
the assignment is valid and active
the assignment is invalid based on the I/O hardware present when the controller was turned ON

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?