Workshop Day 1 Review

Workshop Day 1 Review

12th Grade

8 Qs

quiz-placeholder

Similar activities

Engineering Design Process

Engineering Design Process

12th Grade

10 Qs

Quiz Prototipe dalam Kewirausahaan

Quiz Prototipe dalam Kewirausahaan

12th Grade

10 Qs

Quiz - UI/UX Design

Quiz - UI/UX Design

12th Grade

10 Qs

Sports Quiz

Sports Quiz

6th - 12th Grade

10 Qs

Mlb

Mlb

KG - University

10 Qs

Basketball

Basketball

KG - University

10 Qs

G12. Ch.11-L1 HW

G12. Ch.11-L1 HW

12th Grade

10 Qs

Wrestling

Wrestling

KG - Professional Development

12 Qs

Workshop Day 1 Review

Workshop Day 1 Review

Assessment

Quiz

Other

12th Grade

Medium

Created by

Chris Hershey

Used 2+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In our current world of Bible translation, which question does the OCE specifically address?

How do we provide guidance for inexperienced translators without locking them into a particular methodology?

What is Chris' favorite Indian food?

How do we solve for the flexibility needed to adapt to the still forming oral and theological formation workflows?

How do we give teams the ability to build the tools they want?

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is the MAIN GOAL of a Proof of Concept?

To have a working alpha of a project

Whether success or failure, see if our concept is possible

Provide a wireframe for our project

To have a working beta of a project

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to Bincy & ChatGPT, a MVP should take about...

2-3 years

1 year

6 months

2-3 months

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which stage in the LEAN process should unit testing begin?

Prototype

Proof of Concept

1.0 Release

MVP

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False:
The stages of the LEAN process (PoC -> Prototype -> MVP) should always be followed in a waterfall process one after the other

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these is the MOST important aspect of a proof of concept?

No test cases are written

Not incorporating all of the functionality

A well defined concept that we are trying to prove

There is no documentation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which part of the LEAN process would usually involve a small subset of users?

Proof of concept

  1. Alpha

MVP

Prototype

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which part of the LEAN process would have multiple subsets of users?

Prototype

MVP

Proof of Concept

Project OAK