Prestressed Concrete HW 1b

Prestressed Concrete HW 1b

Professional Development

10 Qs

quiz-placeholder

Similar activities

6035 | Drainage systems | LO1.1

6035 | Drainage systems | LO1.1

Professional Development

13 Qs

6035 | Processes | LO6

6035 | Processes | LO6

Professional Development

10 Qs

L2 Common Plumbing Processes PT1

L2 Common Plumbing Processes PT1

University - Professional Development

10 Qs

6035 | Central Heating LO1 Part 2

6035 | Central Heating LO1 Part 2

Professional Development

14 Qs

Burgers

Burgers

Professional Development

15 Qs

Prestressed Concrete HW 1a

Prestressed Concrete HW 1a

Professional Development

11 Qs

Prestressed Concrete HW 1c

Prestressed Concrete HW 1c

Professional Development

10 Qs

Cold Water Systems LO2

Cold Water Systems LO2

Professional Development

13 Qs

Prestressed Concrete HW 1b

Prestressed Concrete HW 1b

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Piledriverob Piledriverob2375

Used 14+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Do not start any transition curvature in a Tendon closer than_____ from the stressing Anchorage.

12 INCHES

6 inches

12 inches plus 1

Answer explanation

FIELD MANAUL fig. 4-4

SPECIFICATIONS 3.7.5.3

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Beam Tendons should be supported at a maximum spacing of ?

48 INCHES

24"

13"

Answer explanation

FIELD MANUAL 4.5.2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Couplers should only be used at locations approved by the _________.

LDP

License

Design

Professional

supervisor

foreman

Answer explanation

FIELD MANUAL 9.10.3

SPECIFICATIONS 2.4.3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Extension cords for stressing equipment at a minimum should be three-wire, 12 gauge & less than ______ in length

100 FEET

50'

1000'

Answer explanation

FIELD MANULA 6.3.(g)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Proper concrete consolidation is most critical at the ___________.

ANCHORAGE ZONE

midspan

entire pour

Answer explanation

FIELD MANUAL 5.1.3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A minimum clear distance of ______ should be maintained between PT Tendons & blocked out openings.

3 INCHES

6 inches plus 1

12 inches

Answer explanation

FIELD MANUAL 4.4.19

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tape used as a component for sheathing repairs shall have a minimum width of _____.

2 INCHES

1-1/2 inches

6 inches

Answer explanation

SPECIFICATIONS 2.4.3.2

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?