
Northern Air Cargo Deferral Authorization Pre
Authored by Arianus J
Other
8th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
11 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Deferral activity (Initiation or Clearing) will be coordinated with?
Crew Chief
Flight control and pilots
Maintenance Control
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who can initiate deferrals?
Flight crew and mechanics when approved by deferral authorized person
Personnel with Deferral authorization
Both A & B
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What date is entered on the log sheet when deferring maintenance?
The local date of deferral
The UTC (Zulu) date of deferral
The Julian date the aircraft flies
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who is authorized to clear deferrals?
Anyone approved by Maintenance Control
Only Deferral authorized personnel
Anyone holding a valid Airframe and Powerplant certification
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
All Northern Air Cargo deferrals are required to be entered in the logbook.
True
False
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
RVSM is an acronym for
Required Vector System Management
Required Vertical Separation Minimum
Reduced Vertical Separation Minimum
Ridiculously Vain Stick Movers
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How long is a Category B deferral?
Time interval specified in the remarks column of the MEL
3 consecutive calendar days
10 consecutive calendar days
120 consecutive calendar days
3 Feet from the end
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?