
TGM, ITP's and carpentry fitout
Authored by Douglas Thomas
Design
University
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
12 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
30 sec • 3 pts
Which of the following are pertinent in the TQM Circle of continuous improvement ?
Checking
taking action
planning
doing
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Why is continuous improvement relevant to the construction industry ?
Different projects on different sites require adapting and constant review of processes
Continually innovating sector
All of these
A large group of people involved in the process.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following stakeholders shouldnt be considered in the TQM process of a construction company.
Consultants
Suppliers
Subcontractors
Site staff
None of these
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is responsible for the PDCA cycle
W.E Demming
K.Ishikawa
Joseph Juran
Philip Crosby
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is not critical in an ITP.
Stakeholder meetings
Design accuracy
Safety
Accountability for process
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following shouldn't be included in an ITP ?
Design review
Safety considerations
Consultant specifications
Codes and standards
Specifications of onsite workers coffee preference.
7.
MULTIPLE SELECT QUESTION
45 sec • 2 pts
Which of the following should be included in an ITP ?
Material supply and quality checks
Inspection points
Sign offs
Requests for time extensions
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?