PRESTRESSED one

PRESTRESSED one

Professional Development

16 Qs

quiz-placeholder

Similar activities

PERFORMANCE CHECK AFS 2024

PERFORMANCE CHECK AFS 2024

Professional Development

15 Qs

Payroll Basic Knowledge Test

Payroll Basic Knowledge Test

Professional Development

16 Qs

CESOM - Satellite Ops - Sect 1

CESOM - Satellite Ops - Sect 1

Professional Development

15 Qs

Part 6- INTERNATIONAL MECHANICAL CODE

Part 6- INTERNATIONAL MECHANICAL CODE

Professional Development

16 Qs

Promotion Rules for secondary classes (KVS)

Promotion Rules for secondary classes (KVS)

Professional Development

20 Qs

PAM Form 2006

PAM Form 2006

Professional Development

14 Qs

Standard BOQ - Pre Test

Standard BOQ - Pre Test

Professional Development

16 Qs

Government Procurement 101

Government Procurement 101

Professional Development

11 Qs

PRESTRESSED one

PRESTRESSED one

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Piledriverob Piledriverob2375

Used 18+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( Rock & Soils definition 2 )

The prestressing force in the tendon immediately. after transferring the load from the jack to the anchor head is the ________

LOCK-OFF LOAD

lift-off test

Jack Length

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ACI318 construction docs & insp. 26.10.2 g )

Loss of prestress force due to unreplaced broken prestressed reinforcement shall not exceed ______ of the total prestress force in prestressed concrete members,

2 %

5%

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( Rock & Soils site evaluation 6.5 )

The depth of boreholes shall be chosen to allow exploration of the bond length and at least

5 feet beyond

1ft beyond

3ft beyond

4ft beyond

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ACI318 reinforcement details 25.9.4.4.6 )

The bars shall extend at least __ in. either side of the outer edges of the device.

6

4

2

3

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( Rock & Soils bar 4.2.2 ) Bars shall conform to ASTM ___ TYPE II (deformed) bars

A722

A720

A723

A721

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ASTM ) Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete is ASTM ?

A-416

strand

A722

high strength bar

A421

wire

A775

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

When continuously dry , the initial curing temperature of concrete placed in a precast member under plant controlled condition shall not exceed ?

Answer explanation

Media Image

Precast ( CONCRETE )

4.9.5.1 (5c)

pg. 4.50

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?