PRESTRESSED one

PRESTRESSED one

Professional Development

16 Qs

quiz-placeholder

Similar activities

Govt. Initiatives

Govt. Initiatives

Professional Development

15 Qs

Health and Safety Awareness

Health and Safety Awareness

Professional Development

15 Qs

Dashboard Rules

Dashboard Rules

Professional Development

20 Qs

FSSC version 5

FSSC version 5

Professional Development

20 Qs

Pre-Test on Career Progression System

Pre-Test on Career Progression System

Professional Development

20 Qs

NEW PENSION SCHEME

NEW PENSION SCHEME

Professional Development

15 Qs

Taxation on Real Estate Developer, Real Estate Broker and Agents

Taxation on Real Estate Developer, Real Estate Broker and Agents

Professional Development

15 Qs

INSPECCION PREOPERACIONAL

INSPECCION PREOPERACIONAL

Professional Development

13 Qs

PRESTRESSED one

PRESTRESSED one

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Easy

Created by

Piledriverob Piledriverob2375

Used 18+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( Rock & Soils definition 2 )

The prestressing force in the tendon immediately. after transferring the load from the jack to the anchor head is the ________

LOCK-OFF LOAD

lift-off test

Jack Length

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ACI318 construction docs & insp. 26.10.2 g )

Loss of prestress force due to unreplaced broken prestressed reinforcement shall not exceed ______ of the total prestress force in prestressed concrete members,

2 %

5%

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( Rock & Soils site evaluation 6.5 )

The depth of boreholes shall be chosen to allow exploration of the bond length and at least

5 feet beyond

1ft beyond

3ft beyond

4ft beyond

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ACI318 reinforcement details 25.9.4.4.6 )

The bars shall extend at least __ in. either side of the outer edges of the device.

6

4

2

3

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( Rock & Soils bar 4.2.2 ) Bars shall conform to ASTM ___ TYPE II (deformed) bars

A722

A720

A723

A721

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ASTM ) Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete is ASTM ?

A-416

strand

A722

high strength bar

A421

wire

A775

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

When continuously dry , the initial curing temperature of concrete placed in a precast member under plant controlled condition shall not exceed ?

Answer explanation

Media Image

Precast ( CONCRETE )

4.9.5.1 (5c)

pg. 4.50

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?