1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the equation for the Predetermined Overhead Rate (POH)?
Estimated Annual Overhead/Estimated Use of Cost Driver per Activity
Estimated Annual Overhead/Estimated Annual Operating Activity
Estimated Overhead per Activity/Estimated Annual Operating Activity
Estimated Overhead per Activity/Estimated Use of Cost Driver per Activity
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the equation for applied overhead (using Job Order Costing)?
Applied Overhead = AB OH x Actual Operating Activity
Applied Overhead = POH x Actual Use of Cost Driver
Applied Overhead = POH x Actual Operating Activity
Applied Overhead = AB OH x Actual Use of Cost Driver
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the equation for the Activity-Based Overhead Rate (AB OH)?
Estimated Annual Overhead/Estimated Use of Cost Driver per Activity
Estimated Annual Overhead/Estimated Annual Operating Activity
Estimated Overhead per Activity/Estimated Annual Operating Activity
Estimated Overhead per Activity/Estimated Use of Cost Driver per Activity
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the equation for applied overhead (using Activity-Based Costing)?
Applied Overhead = AB OH x Actual Operating Activity
Applied Overhead = POH x Actual Use of Cost Driver
Applied Overhead = POH x Actual Operating Activity
Applied Overhead = AB OH x Actual Use of Cost Driver
Tags
CCSS.5.NBT.A.2
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the equation for Gross Profit?
GP = Revenues + COGS
GP = Revenues - COGS
GP = Revenues - Expenses
GP = Revenues - COGM
Tags
CCSS.8.EE.C.7B
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the equation for Total Manufacturing Costs?
TMC = Beg. FG + COGM - End. FG
TMC = DM - DL - MOH
TMC = Beg. WIP + COGM - End. WIP
TMC = DM + DL + MOH
Tags
CCSS.8.EE.C.7B
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Apply overhead given that POH is 0.26, actual labor hours is 70 hours, and estimated labor hours is 80 hours.
269.23
18.20
20.80
307.69
Tags
CCSS.7.RP.A.3
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?