Mountain Cabin - Episode 3

Mountain Cabin - Episode 3

12th Grade

10 Qs

quiz-placeholder

Similar activities

BGS Music Quiz

BGS Music Quiz

1st - 12th Grade

10 Qs

rubiks cube quiz

rubiks cube quiz

KG - Professional Development

13 Qs

Trójkąty i pitagoras

Trójkąty i pitagoras

10th - 12th Grade

10 Qs

RAPAT TELECONFERENCE

RAPAT TELECONFERENCE

12th Grade - University

10 Qs

General Knowledge (TEST)

General Knowledge (TEST)

KG - 12th Grade

10 Qs

Trial - Quiz Bowl HS

Trial - Quiz Bowl HS

10th - 12th Grade

10 Qs

Purification & Types of water

Purification & Types of water

1st Grade - Professional Development

15 Qs

ચાલો.....રમતા રમતા શિખીએ

ચાલો.....રમતા રમતા શિખીએ

5th - 12th Grade

15 Qs

Mountain Cabin - Episode 3

Mountain Cabin - Episode 3

Assessment

Quiz

Other

12th Grade

Practice Problem

Hard

Created by

Michael Smiley

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the clause in the contract regarding rock excavation?

To charge more money for digging deeper or wider footings

To prevent people from building houses on unstable ground

To ensure the contractor is compensated for additional work

To discourage excessive digging of deep footings

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the benefit of using a rotary laser for setting grade pins?

It provides a wider range for accurate readings

It can shoot grade in two directions

It has a self-leveling feature

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the workers need to move the Tahoe and park it up the hill?

To avoid getting blocked in by the power diggers

To have a better view of the construction site

To prevent the Tahoe from getting damaged

To make space for the excavation machinery

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the brown porta john?

To provide a better view of the surroundings

To prevent people from going over the bank

To keep the workers warm in cold weather

To add a touch of color to the construction site

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the workers need to go at the rock from different angles?

To find the grain of the rock and remove it more easily

To create a more interesting excavation pattern

To test the strength of the rock

To make the digging process more challenging

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of setting grade pins for the concrete footings?

To ensure the footings are level

To provide a reference point for pouring concrete

To check the slope of the construction site

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the workers need to cut the grade pins instead of beating them down?

The ground was too hard to beat the pins down

To save time and effort

To ensure the pins are securely in place

To create a cleaner and more precise finish

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?