SCMBC Requisition Management

SCMBC Requisition Management

41 Qs

quiz-placeholder

Similar activities

แบบทดสอบปลายภาคเรียนวิชาคณิตศาสตร์เพิ่มเติม  1/2567   ม.4/1

แบบทดสอบปลายภาคเรียนวิชาคณิตศาสตร์เพิ่มเติม 1/2567 ม.4/1

9th Grade

40 Qs

Chapter 22: Skeletal, Muscular, Integumentary System

Chapter 22: Skeletal, Muscular, Integumentary System

6th - 8th Grade

37 Qs

Final Term Exam 2021-Computer-G3

Final Term Exam 2021-Computer-G3

3rd Grade

40 Qs

8th Grade Civics Final Exam 2019

8th Grade Civics Final Exam 2019

8th Grade

40 Qs

Irregular verbs

Irregular verbs

7th - 10th Grade

40 Qs

Tiếng Anh 4 -unit 3 + 4

Tiếng Anh 4 -unit 3 + 4

4th Grade

45 Qs

PRAMUKA LCC

PRAMUKA LCC

12th Grade

40 Qs

Chapter 6 - Linear Equations

Chapter 6 - Linear Equations

10th - 11th Grade

45 Qs

SCMBC Requisition Management

SCMBC Requisition Management

Assessment

Quiz

Practice Problem

Easy

Created by

Sean Hennessey

Used 104+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

41 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

U.S. forces, programs or projects that are most

important militarily in the opinion of the Chairman

of the Joint Chiefs of Staff and approved by

the Secretary of Defense.

F/AD IV

F/AD I

F/AD II

F/AD V

F/AD III

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which DIC is an indicator or communication from the source of supply?

ATA

AE1

A01

AB1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You received a Walk-Thru request from one of your commodity sections. You contacted the SMU and the item the commodity section is requesting is on hand. What are the next steps in the processing of this request? 

Contact SMU for on hand, CO signature, and follow local SMU SOP

Prepare a local SMU request form and send to the SOS.

Prepare a DD Form 1149, obtain authorized signature, and submit to the SMU.

Roll up and grab what you need

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Document Identifier Code (DIC) for an overseas (OCONUS) requisition

A0A

AE1

A01

AS1

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You can perform a walk-thru requisition for Urgency of Need Designator (UND) "A" and "B"? 

TRUE

FALSE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Requisition parts or equipment requiring immediate installation to end items that prevent units from performing their assigned operational and training mission.

UND A

UND B

UND C

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The purpose of the Maintenance Production Report (MPR) is to provide maintenance managers a list of all inactive service requests for equipment in the maintenance cycle.

TRUE

FALSE

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?