Cannock inspection and Testing 2

Cannock inspection and Testing 2

Professional Development

19 Qs

quiz-placeholder

Similar activities

Induction Post Training Test

Induction Post Training Test

Professional Development

20 Qs

DMS REMSCAR QUIZ

DMS REMSCAR QUIZ

Professional Development

15 Qs

7B.2 (Part 2)

7B.2 (Part 2)

Professional Development

20 Qs

Selling Skills

Selling Skills

Professional Development

15 Qs

FILMS

FILMS

KG - Professional Development

15 Qs

International Women's Day 2019

International Women's Day 2019

Professional Development

15 Qs

Songs & Song Artists

Songs & Song Artists

3rd Grade - Professional Development

20 Qs

jesus

jesus

Professional Development

14 Qs

Cannock inspection and Testing 2

Cannock inspection and Testing 2

Assessment

Quiz

Other

Professional Development

Medium

Created by

Paul Hussey

Used 36+ times

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

OSG gives the maximum stable value of Ze for a TT installation as

100 ohms

21 ohms

0.8 ohms

200 ohms

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Safe isolation should be carried out by

A Skilled person

An engineer

The home owner

The client

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which type of earthing system relies on a separately supplied earth, usually the sheathing on the cable

TT

TN-S

TN-C-S

IT

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following would not be one of the human senses to use during the

initial verification of an addition to a lighting circuit:

smell

taste

sight

hearing

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The person carrying out inspection and testing must have

An On site guide

A Megger

Sound knowledge and experience relevant to the installation being inspected

A decent van

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The top surface of a consumer unit should be protected from ingress of dust to a standard of

IP4X

IP2X

IPX4

IPX2

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A visual inspection is necessary

before testing to check whether

The ZS is within the maximum allowed

Switch gear is accessible

The insulation resistance is acceptable

RCD testing is acceptable

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?