Search Header Logo

27105 Flooring Systems TT's

Authored by Christopher Foy

Specialty

11th Grade

Used 6+ times

27105 Flooring Systems TT's
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The air-handling equipment placed in a commercial building would be considered part of the _____.


dead load

live load

sick load

recovery load

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Studs and joists are commonly installed at 16" _____.


on center

off centered

only centered

often centered

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before installing hardwood flooring, _____ would most likely be installed over the subfloor.


overlayment

side to side lYMENT

underlayment

crisscross layment

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Masonry _____ may be used to support other structural members such as girders and beams.


piers

lally columns

concrete joists

firestops

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A joist can be secured to the structure using a _____.


hangin chad

hanger screws

rim joists

joist hangers

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The distance between structural supports of a floor system is known as the _____.


span

run

crown

riser

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The _____ joist is created with the header joists and end joists.


tail

rim

rough

cripple

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?