NEC practice quiz

NEC practice quiz

University

25 Qs

quiz-placeholder

Similar activities

APP - Función Derivada

APP - Función Derivada

University - Professional Development

20 Qs

5357 Electrical

5357 Electrical

10th Grade - Professional Development

20 Qs

OPEFINAN-SESION 1-VALOR DEL DINERO EN EL TIEMPO

OPEFINAN-SESION 1-VALOR DEL DINERO EN EL TIEMPO

University

20 Qs

Identifying and Representing Data

Identifying and Representing Data

7th Grade - University

20 Qs

Los Números Naturales - 5to (parte 4)

Los Números Naturales - 5to (parte 4)

5th Grade - University

20 Qs

Primer grado Cruz Conga

Primer grado Cruz Conga

7th Grade - University

20 Qs

Problemas matemáticos

Problemas matemáticos

1st Grade - University

20 Qs

NEC practice quiz

NEC practice quiz

Assessment

Quiz

Mathematics

University

Practice Problem

Hard

CCSS
6.RP.A.3C, 6.RP.A.3B

Standards-aligned

Created by

Mr. Know-It-all

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

In any anesthetizing location, all metal raceways and metal-sheathed cable and all normally non-current-carrying conductive portions of fixed electric equipment must be connected to ____________.

listed sealing devices

an equipment grounding conductor

strain-relief devices

low-voltage transformers

Answer explanation

517.62

2.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

The three branches of a health care facility system are :

I. life safety , critical, grounded

II. critical, lighting, life safety

III. life safety, critical, equipment

IV. high voltage, low voltage , communications

I.

II.

III.

IV.

Answer explanation

517.31 (A)

3.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

A 20,000 ft square office building is served by a 480 Y/277 V, three-phase service. The building contains the following loads.

Calculate the total feeder load:

10,000 VA, 208 V, three-phase sign

100 duplex receptacles supplying continuous loads rated 180 VA each

30 ' long show window

12 kVA, 208Y/120V three-phase electric range

10 kVA, 208Y/120V three-phase electric oven

20 kVA, 480 V three phase water heater , 7.5 hp, 480 V three-phase motor

75 -150 watt 120 V incandescent lighting fixtures, 200 - 200 VA input , 277 V fluorescent fixtures

40 kVA, 480 V three-phase electric heating unit

60 A, 480 V, three-phase air-conditioning unit

22,000 VA

51,563 VA

73,563 VA

75,633 VA

Answer explanation

  1. Calculate the rec. loads - 100 x 180 VA = 18,000 VA

  2. 220.44 T. first 10000 @ 100 % = 10,000 VA

  3. Remaining 8,000 VA @ 50 % = 4,000 VA (14,000 VA)

  4. Calculate show windows 200 VA x 30 ' = (6,000 VA )

  5. Incandescent lighting 75 @ 150 VA = (11,250 VA)

  6. 10 kVA sign = 10,000 VA = (10,000 VA)

  7. 12 kVA range = 12,000 VA = (12,000 VA)

  8. 10 kVA oven = 10,000 VA = (10,000 VA)

  9. Non - Continuous loads @ 100 % =

  10. Range - 12,000 VA + oven 10,000 VA = 22,0000 VA

  11. Continuous loads @ 125 % =

  12. Receptacles - 14,000 VA + Show window 6,000 VA + Lighting 11,250 VA + Sign 10,000 VA = 41,250 VA x 125 % = 51,563

  13. Total Feeder load = Non-Cont. + Cont. = 22,000 VA + 51,563 =

  14. 73,563 VA

4.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

The field windings of an AC generator are located on the ________.

generator rotor

generator stator

generator transfer switch

generator exciter

5.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

A timing relay that provides the timed dely after the relay is energized is called a(n)

on-delay relay

off-delay relay

delay-on-break relay

timed-closed relay

6.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

A current transformer __________ a single-phase transformer.

can never be

considers a high kVA

is a isolation type of

is always

7.

MULTIPLE CHOICE QUESTION

5 mins • 4 pts

Media Image

The symbol in the diagram represents a(n)

motor overload

triac

light emitting diode

photo cell

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?