23-24 DBF Rules Quiz

23-24 DBF Rules Quiz

University

11 Qs

quiz-placeholder

Similar activities

Airport Engineering

Airport Engineering

University

10 Qs

Exam Preparation HS

Exam Preparation HS

University

11 Qs

destiny 2 questions

destiny 2 questions

KG - Professional Development

10 Qs

quizz for Power pinch analysis using PoCA and SCT

quizz for Power pinch analysis using PoCA and SCT

University

10 Qs

Design C Summative

Design C Summative

7th Grade - University

15 Qs

aIRPLANE

aIRPLANE

6th Grade - Professional Development

16 Qs

PreQuiz Tunnel Chapter

PreQuiz Tunnel Chapter

University

7 Qs

CPCCBC4001A

CPCCBC4001A

University

15 Qs

23-24 DBF Rules Quiz

23-24 DBF Rules Quiz

Assessment

Quiz

Design

University

Hard

Created by

Jevoni Sykes

Used 1+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

What is the theme for this years competition?

Electronic Warfare

Urban Air Mobility

Humanitarian Aid

Star Wars

2.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

Which city is the competition held in?
Wichita, KA
Tuscon, AZ
Webster Field, MD
Denver, CO

3.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

What is the maximum wingspan permitted for the aircraft?
4 Feet
5 Feet
6 Feet
8 Feet

4.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

What must the aircraft carry during mission 2?
Crew & Passengers
Crew, EMTs, Patient, Gurney & Medical Supply Cabinet
Crew Only
Just the Avionics & Propulsion Battery

5.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

How must the crew (“pilot” & “co-pilot”) be loaded?
Loaded from the top of the aircraft via hinged canopy
Loaded from the rear bulkhead via bulkhead panel
Loaded from the side via panel extending no more than 6 inches and not crossing the centerline of the aircraft
Loaded from the top or side of the aircraft with no hatch dimensional constraints

6.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

How must the aircraft take-off?
The airplane must use ground rolling takeoff within 20 feet of the start/finish line
The airplane must use ground rolling takeoff within 25 feet of the start/finish line
The airplane must use ground rolling takeoff within 15 feet of the start/finish line
The airplane must takeoff within 25 feet of the start/finish line, and may do so using rotating engines so long as vertical takeoff is not used

7.

MULTIPLE CHOICE QUESTION

20 sec • 20 pts

What is not permitted for this year’s battery setup?
One battery connected to a propulsion system
Using NiCad/NiMH or Lithium based batteries
Using the propulsion battery to control the servos and transmitters
Propulsion power pack that contains 99 Watt-hours

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?