Software Engineering

Software Engineering

Professional Development

•

30 Qs

quiz-placeholder

Similar activities

Quiz - Chapter 8: Momentum and Collisions (2/17)

Quiz - Chapter 8: Momentum and Collisions (2/17)

9th Grade - Professional Development

•

25 Qs

Motor and Transformer Winding

Motor and Transformer Winding

Professional Development

•

25 Qs

ESP Units 5-6 Review

ESP Units 5-6 Review

Professional Development

•

25 Qs

solar eclipse

solar eclipse

KG - Professional Development

•

25 Qs

Exam - 3 - Membrane and action potentials and refractory preiod

Exam - 3 - Membrane and action potentials and refractory preiod

Professional Development

•

25 Qs

Review Pengenalan BB dan Sampling [by DMM]

Review Pengenalan BB dan Sampling [by DMM]

Professional Development

•

25 Qs

Generic Names: 76-100

Generic Names: 76-100

Professional Development

•

25 Qs

Drugs for diabetes

Drugs for diabetes

University - Professional Development

•

25 Qs

Software Engineering

Software Engineering

Assessment

Quiz

•

Science

•

Professional Development

•

Practice Problem

•

Easy

Created by

Renukadevi Selvam

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 1. What is the primary goal of software engineering?

Developing software without a structured approach

Building software quickly, regardless of quality

Producing high-quality software systematically

Reducing the cost of software development

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 2. In which software process model do you complete one phase before moving on to the next, and there is no overlap between phases?

  • Waterfall model

  • V model

  • Iterative model

  • Spiral model

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 3. What is a fundamental principle of Scrum?

  • Constantly working at maximum capacity

  • Complete specification of all requirements up front

  • Regular inspection and adaptation

  • Avoiding customer involvement

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 4.In Extreme Programming (XP), what practice involves two programmers working together at one computer?

  • Continuous integration

  • Pair programming

  • Test-driven development

  • Big design up front

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

5.Which of the following is NOT a typical phase in the Software Development Life Cycle (SDLC)?

  • Requirements analysis

  • Coding and programming

  • Quality assurance

  • Marketing and sales

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

6.What is the primary goal of the Scrum process?

  • To complete all project tasks as quickly as possible

  • To maximize the use of project management tools

  • To deliver a potentially shippable product increment at the end of each sprint

  • To adhere to a rigid project plan without changes

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

7.Which Scrum event provides an opportunity for the team to inspect and adapt its processes and work?

  • Daily Stand-up

  • Sprint Review

  • Sprint Planning

  • Sprint Retrospective

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?