Software Engineering

Software Engineering

Professional Development

30 Qs

quiz-placeholder

Similar activities

GK Quiz

GK Quiz

KG - Professional Development

25 Qs

Astronomy

Astronomy

KG - Professional Development

25 Qs

Nutrition in animals/Heat Quiz

Nutrition in animals/Heat Quiz

7th Grade - Professional Development

25 Qs

Present Weather Coding

Present Weather Coding

Professional Development

25 Qs

KDP: 1st Monthly Exam

KDP: 1st Monthly Exam

Professional Development

25 Qs

Basic Electronics Quiz

Basic Electronics Quiz

University - Professional Development

25 Qs

DARJAH KHAS

DARJAH KHAS

1st Grade - Professional Development

25 Qs

Science Trivia Night

Science Trivia Night

12th Grade - Professional Development

25 Qs

Software Engineering

Software Engineering

Assessment

Quiz

Science

Professional Development

Practice Problem

Easy

Created by

Renukadevi Selvam

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 1. What is the primary goal of software engineering?

Developing software without a structured approach

Building software quickly, regardless of quality

Producing high-quality software systematically

Reducing the cost of software development

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 2. In which software process model do you complete one phase before moving on to the next, and there is no overlap between phases?

  • Waterfall model

  • V model

  • Iterative model

  • Spiral model

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 3. What is a fundamental principle of Scrum?

  • Constantly working at maximum capacity

  • Complete specification of all requirements up front

  • Regular inspection and adaptation

  • Avoiding customer involvement

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. 4.In Extreme Programming (XP), what practice involves two programmers working together at one computer?

  • Continuous integration

  • Pair programming

  • Test-driven development

  • Big design up front

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

5.Which of the following is NOT a typical phase in the Software Development Life Cycle (SDLC)?

  • Requirements analysis

  • Coding and programming

  • Quality assurance

  • Marketing and sales

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

6.What is the primary goal of the Scrum process?

  • To complete all project tasks as quickly as possible

  • To maximize the use of project management tools

  • To deliver a potentially shippable product increment at the end of each sprint

  • To adhere to a rigid project plan without changes

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

7.Which Scrum event provides an opportunity for the team to inspect and adapt its processes and work?

  • Daily Stand-up

  • Sprint Review

  • Sprint Planning

  • Sprint Retrospective

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?