1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The maximum suction height from the tank to the DO. burner is .......?

3.5m

12m

9m

6.5

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The suction from the flue gas fan creates a ........... pressure in the combustion chamber.

Atmospheric

Positive

Negative

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

At which chamber temperature can the sluice door be opened and feeding of garbage can start?

Select the ONE correct answer

200°C

1200°C

750'C

600°C

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

According to this module: how often should the refractory lining be checked? Select the ONE correct answer.

When in dry-dock

Monthly

Yearly

Every Six months

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What should the diesel oil pressure be at the diesel oil burner? Select the ONE correct answer 60 bar 1 bar 04 bar 16 bar

16 bar

0.4 bar

60 bar

1 bar

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

When burning sludge, the sludge will be heated up to which temperature? Select the ONE correct answer

As long as it is more than 0°C it doesn't matter.

145°C

45°C

85°C

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which key should be pressed if you want to see the history alarm log? Select the ONE correct answer.

[LIST]

[PREV]

[INFO]

[ACK]

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?