STANDARDS PROFESSIONAL PRACTICE

STANDARDS PROFESSIONAL PRACTICE

Professional Development

20 Qs

quiz-placeholder

Similar activities

Addressing Challenging Behaviors (Part 1): Understanding the Act

Addressing Challenging Behaviors (Part 1): Understanding the Act

Professional Development

16 Qs

Chemistry 10-4-1 week

Chemistry 10-4-1 week

7th Grade - Professional Development

15 Qs

Prepositions for Giving Directions

Prepositions for Giving Directions

1st Grade - Professional Development

20 Qs

Fighter-Quiz 1- Day 1&2

Fighter-Quiz 1- Day 1&2

University - Professional Development

15 Qs

Ways of expressing the future

Ways of expressing the future

Professional Development

15 Qs

Contract law 1

Contract law 1

Professional Development

20 Qs

Syllable Stress

Syllable Stress

KG - Professional Development

20 Qs

Articles in English [General] (Advanced)

Articles in English [General] (Advanced)

KG - Professional Development

20 Qs

STANDARDS PROFESSIONAL PRACTICE

STANDARDS PROFESSIONAL PRACTICE

Assessment

Quiz

English

Professional Development

Medium

Created by

Rem Kulnakool

Used 21+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This method of compensation is based on technical hours spent and is only applicable to non-creative work since the value of design cannot be measured by the length of time the designer has spent on his work. This is usually used for works such as accounting, secretarial, research,data gathering preparation of reports and the like.

PCC

MDPE

PFPE

LUMP SUM OR FIXED FEE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is the most common method of compensation which is also fair to both the client and architect.

Percentage based on Project fee

Professional fee plus Expenses

Lump Sum or fixed Fee

MDPE

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A statue specifying the period of time within which legal action must be brought for alleged damage or injury

LEASE

STATUE OF FRAUDS

STATUE OF LIMITATION

LEASEHOLD

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A list of instructions stipulating the manner on which bids are to be prepared

INSTRUCTION TO BIDDER

CLOSED SPECIFICATION

STATUE OF LIMITATION

PERFORMANCE BOND

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A stipulation of the use of specific products or processes without provision for substitution

BID

CLOSED SPECIFICATION

PERFORMANCE BOND

CERTIFICATE OF PAYMENT

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An offer to perform the work prescribed in a contract at a specified cost

BID

PERFORMANCE BOND

CERTIFICATE OF PAYMENT

QUOTATION

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Means to built in, mount in position, connect or apply any object specified ready for the intended use.

INSTALL

PROVIDE

WORK

FURNISH

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?