Quiz : QC

Quiz : QC

Professional Development

20 Qs

quiz-placeholder

Similar activities

CESOM - Satellite Ops - Sect 1

CESOM - Satellite Ops - Sect 1

Professional Development

15 Qs

Residential Sprinklers

Residential Sprinklers

Professional Development

18 Qs

ISO 55001: Awareness 1 (Distribution)

ISO 55001: Awareness 1 (Distribution)

Professional Development

20 Qs

Part 6- INTERNATIONAL MECHANICAL CODE

Part 6- INTERNATIONAL MECHANICAL CODE

Professional Development

16 Qs

Promotion Rules for secondary classes (KVS)

Promotion Rules for secondary classes (KVS)

Professional Development

20 Qs

Requirements for System Types

Requirements for System Types

Professional Development

20 Qs

One-time Cleansing 1.1

One-time Cleansing 1.1

Professional Development

20 Qs

Requirements for System Components

Requirements for System Components

Professional Development

17 Qs

Quiz : QC

Quiz : QC

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Vijendra Rathore

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

While performing RFI ( Request for Inspection), Site Execution teams shall inform to planning team on daily basis for intended next day work consisting location, Activity, Time by __ of the same day

3:00PM

6:00PM

5:00PM

12:00PM

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

While fixing Road alignment, internal calibration shall be carried out every

1 Week

1 Month

Once

Daily

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Clearing is defined as removing and disposing of all unwanted surface material, such as trees, brush, grass, weeds, downed trees, and other material. Grubbing is defined as removing and disposing of all unwanted vegetative matter from underground, such as stumps, roots, buried logs, and other debris.

Question: Grubbing is done for the maximum girth of

100MM

150MM

300MM

250MM

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum depth of ground clearing the top soil is up to

50MM

100MM

150MM

200MM

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Original Ground level (OGL)

means the level of the ground that existed before any excavation for new buildings or structures on the land is undertaken.

Question: OGL will be taken after

Clearing and Grubbing and Compaction.

only Compaction

Only Clearing

Only grubbing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before commencing the earthwork, we need to mark

Row Line

Center Line

Toe Line

Boundary Line

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The soil in earthwork should be compacted up to ____ of lab MDD.

60%

95%

70%

90%

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?