Postest Volume Pondasi batu kali

Postest Volume Pondasi batu kali

11th Grade

5 Qs

quiz-placeholder

Similar activities

Spesifikasi dari Jembatan

Spesifikasi dari Jembatan

11th Grade

10 Qs

PAS XI DPIB kjj

PAS XI DPIB kjj

11th Grade

10 Qs

PONDASI, KOLOM, BALOK BETON BERTULANG

PONDASI, KOLOM, BALOK BETON BERTULANG

11th Grade

10 Qs

VOLUME PEKERJAAN

VOLUME PEKERJAAN

KG - Professional Development

7 Qs

KUIS

KUIS

10th Grade - University

10 Qs

Jenis-Jenis Alat Berat pada Pekerjaan Konstruksi

Jenis-Jenis Alat Berat pada Pekerjaan Konstruksi

10th - 12th Grade

5 Qs

PAS XI DPIB kug

PAS XI DPIB kug

11th Grade

10 Qs

LATIHAN SOAL PONDASI (X-TKP)

LATIHAN SOAL PONDASI (X-TKP)

9th - 12th Grade

10 Qs

Postest Volume Pondasi batu kali

Postest Volume Pondasi batu kali

Assessment

Quiz

Architecture

11th Grade

Easy

Created by

HARYONO HARYONO

Used 2+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 10 pts

Jika diketahui panjang pondasi 10 m, dengan tinggi (t) penampang pasir urug 20 cm dan lebar 1 m, berapakah volume pekerjaan urugan pasir?

2.

MULTIPLE CHOICE QUESTION

1 min • 10 pts

Volume pekerjaan pondasi batu kali dapat dihitung dengan rumus ..............

V = Luas penampang x panjang urugan

V = 1/3 x Volume galian pondasi

V = Luas penampang pondasi x panjang pondasi

V = panjang besi x berat besi

3.

MULTIPLE CHOICE QUESTION

1 min • 10 pts

Yang termasuk pekerjaan pondasi batu kali adalah sebagai berikut, kecuali......

Pekerjaan Bekisting

Pekerjaan Galian Pondasi Batu Kali

Pekerjaan Urugan Pasir

Pekerjaan Anstamping

4.

MULTIPLE CHOICE QUESTION

1 min • 10 pts

Media Image

Rumus luas bidang di samping adalah........

5.

MULTIPLE CHOICE QUESTION

1 min • 10 pts

Media Image

Berapakah luas penampang Aanstamping pada gambar di samping...........