ISTQB Chapter 2

ISTQB Chapter 2

9 Qs

quiz-placeholder

Similar activities

Assessment and Evaluation

Assessment and Evaluation

University

10 Qs

PLTW Design Process Quiz

PLTW Design Process Quiz

8th Grade

10 Qs

Scientific Method

Scientific Method

9th - 12th Grade

10 Qs

Staar Test Strategies

Staar Test Strategies

2nd - 5th Grade

10 Qs

Item Analysis in Educational Research

Item Analysis in Educational Research

University

10 Qs

MAP Test Taking Strategies

MAP Test Taking Strategies

8th Grade

12 Qs

IGCSE CH 7 SYSTEMS LIFECYCLE : ANALYSIS

IGCSE CH 7 SYSTEMS LIFECYCLE : ANALYSIS

10th Grade

11 Qs

4. Testing V Model

4. Testing V Model

University

10 Qs

ISTQB Chapter 2

ISTQB Chapter 2

Assessment

Quiz

Easy

Created by

Ondrej Hudlicky

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 1 What are good practices for testing within the development life cycle? 

a. Early test analysis and design.

b. Different test levels are defined with specific objectives.

c. Testers will start to get involved as soon as coding is done.

d. A and B above.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 2 Which option best describes objectives for test levels with a life cycle model? 

a. Objectives should be generic for any test level. 

b. Objectives are the same for each test level. 

c. The objectives of a test level don't need to be defined in advance. 

d. Each level has objectives specific to that level. 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 3 Which of the following is a test type? 

a. Component testing 

b. Functional testing 

c. System testing 

d. Acceptance testing 

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 4 Which of the following is a nonfunctional quality characteristic?

a. Feasibility 

b. Usability 

c. Maintenance 

d. Regression 

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 5 Which of these is a functional test? 

a. Measuring response time on an on-line booking system. 

b. Checking the effect of high volumes of traffic in a call-center system. 

c. Checking the on-line bookings screen information and the database contents against the information on the letter to the customers. 

d. Checking how easy the system is to use. 

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 6 Which of the following is a true statement regarding the process of fixing emergency changes? 

a. There is no time to test the change before it goes live, so only the best developers should do this work and should not involve testers as they slow down the process. 

b. Just run the retest of the defect actually fixed.

c. Always run a full regression test of the whole system in case other parts of the system have been adversely affected.

d. Retest the changed area and then use risk assessment to decide on a reasonable subset of the whole regression test to run in case other parts of the system have been adversely affected.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 7 A regression test: 

a. Is only run once. 

b. Will always be automated.

c. Will check unchanged areas of the software to see if they have been affected.

d. Will check changed areas of the software to see if they have been affected.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 8 Non-functional testing includes: 

a. Testing to see where the system does not function correctly. 

b. Testing the quality attributes of the system including reliability and usability. 

c. Gaining user approval for the system. 

d. Testing a system feature using only the software required for that function. 

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 9 Beta testing is: 

a. Performed by customers at their own site. 

b. Performed by customers at the software developer's site.

c. Performed by an independent test team. 

d. Useful to test software developed for a specific customer or user.