EGII W3 Tuesday

EGII W3 Tuesday

University

10 Qs

quiz-placeholder

Similar activities

PTRT 1491 Chapter 10 - Motor Electrical Problems

PTRT 1491 Chapter 10 - Motor Electrical Problems

University

10 Qs

Module 3- Microbial growth

Module 3- Microbial growth

University

10 Qs

XFMRS week 1 Monday

XFMRS week 1 Monday

University

11 Qs

control system

control system

University

10 Qs

EHVAC & HVDC transmission

EHVAC & HVDC transmission

University

5 Qs

Three-phase Uncontrolled Rectifiers (Part 8)

Three-phase Uncontrolled Rectifiers (Part 8)

University

10 Qs

FORMATIVE ASSESSMENT TOPIC 6

FORMATIVE ASSESSMENT TOPIC 6

University

10 Qs

Concepts of single phase AC circuit part 2

Concepts of single phase AC circuit part 2

University

11 Qs

EGII W3 Tuesday

EGII W3 Tuesday

Assessment

Quiz

Other

University

Medium

Created by

Curtis Espedal

Used 4+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What needs to be done before leaving the work site that involves work performed at a junction pole?

pg.52

Phase check

Amp check

Make sure house meters are on

Voltage check

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be be recorded before starting work on a junction pole where the jumpers will be removed?

pg.52

Where is lunch?

Test phasing sticks

Phase sequence

Rotation at the meter

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What would happen if a normal open switch is not phased correctly and closed?

pg.52

phase to phase fault

nothing

extremely high voltage

Frequency drop

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name for a high voltage voltmeter used for proving phase sequence?

pg.53

Multimeter

Volt meter

Phasing meter

Rotation meter

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name of the part of the phasing sticks that does not have the meter attached to it?

pg.53

Meter probe

Insulated jumper

Phasing probe

Capacitive test point

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the steps taken to prove phase sequence?

pg.54

Test phasing sticks

Verify correct voltage

Confirm proper phasing across open point

Record phase sequence

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the second step in proving phase sequence?

pg. 54

Test phasing sticks

Verify correct voltage on both sides of open point

Confirm proper phase sequence

Record phase sequence

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?