Quiz 4 Composite manufacturing

Quiz 4 Composite manufacturing

University

10 Qs

quiz-placeholder

Similar activities

Polymer Technology

Polymer Technology

University

10 Qs

UTR1

UTR1

University

10 Qs

Artificial Teeth

Artificial Teeth

University

12 Qs

Dental Cements

Dental Cements

4th Grade - University

15 Qs

QUIZ MRC UNIT 3 PREMIX & PREPREG

QUIZ MRC UNIT 3 PREMIX & PREPREG

KG - Professional Development

15 Qs

CE- Transformer-MCQ

CE- Transformer-MCQ

University

15 Qs

SOAL SISTEM MEKANISME KATUP KELAS XI

SOAL SISTEM MEKANISME KATUP KELAS XI

University

10 Qs

Softening of hard water

Softening of hard water

University

11 Qs

Quiz 4 Composite manufacturing

Quiz 4 Composite manufacturing

Assessment

Quiz

Science

University

Hard

Created by

VALERIA MONSERRAT CAMARILLO VEGA

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Type of release agent that prevents chemical bonding between the material and the mold

Teflon barrier

Liquid agent

Wax release

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Retains more resin on the laminate surface

Bleeder

Peel ply

Release film

Breather

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Closed mold process where mixed resin is injected into a dry fiber preform

Spray up

RTM

Pultrusion

Compresion molding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Process that combines short fiber compound and fiber prepegsto produce light weight, complex and integrated parts for aircraft cabin and secondary structures

Spray up

RTM

Pultrusion

Compresion molding

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Process that uses unidirectional, bidirectional and mat as raw material for the creation of composites

Spray up

RTM

Pultrusion

Compresion molding

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the most widely used methods for fabricating advanced composite parts and structures

Prepeg hand lay-up

Hybrid SMC

Filament winding

Fiber placement

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Process that can be automatized, is generally slow and the raw material is low cost.

Prepeg hand lay-up

Hybrid SMC

Filament winding

Fiber placement

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?