1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the process of moving a portion of the earth's surface from one location to another?
Shoring
Trenching
Backfilling
Excavation
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of excavation involves the removal of the exposed layer of the earth’s surface, including any vegetation or decaying matter?
Topsoil excavation
Earth excavation
Rock excavation
Unclassified excavation
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which type of shoring is used to provide horizontal support to the parallel walls of two adjacent buildings?
Raking Shores
Flying Shores
Dead Shores
Straining Shores
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of cut and fill excavation?
To strengthen weak foundation
To provide horizontal support to walls
To move material from one location to another
To form embankments and foundations
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main component used in raking shores to provide temporary support to an unsafe wall?
Cleats
Sole plate
Needles
Bracings
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When is shoring typically removed?
After a week
After a month
After a day
After necessary repairs and modifications
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of trench excavation?
To remove topsoil
To strengthen weak foundation
To bury services such as pipes
To form embankments
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?