Estimating and Costing Quiz

Authored by Harun Gathiaka

Architecture

12th Grade

Used 1+ times

Estimating and Costing Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of a quantity surveyor during the pre-construction period?

Preliminary estimates of the project

Valuation of variation

Preparation of final account

Development of building concepts

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a bill of quantities?

Helps in cost analysis and cost planning

Helps in selecting competitive bidders

Helps in preparation of final payment certificates

Helps in developing building concepts

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum percentage of retention money in large contracts?

5%

8%

10%

2%

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an interim payment certificate?

To commission the project

To prepare the final account

To enable the contractor to get paid for work done during the project time

To release the final payment to the contractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the method commonly used for preparing payment certificates?

By estimation

Stage by stage

Minimum payment

By calendar

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of approximate estimation in construction?

To produce a focus of the possible or probable cost of a project before the building is designed in detail

To determine the exact cost of a project after the building is completed

To compare the cost of different construction materials

To calculate the cost of labor for a construction project

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What factors should be considered when choosing the method of approximate estimating to use?

Information available, available time, degree of accuracy, experience of the estimator

Type of soil, form of construction, circulation space, maintenance services

Site location, market conditions, tendering procedures, financial conditions

Size of the structure, plan shape, wall/floor area ratio, storey height/overall heights

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?