Estimating and Costing Quiz

Estimating and Costing Quiz

12th Grade

10 Qs

quiz-placeholder

Similar activities

Bolting and Area Concepts

Bolting and Area Concepts

12th Grade

11 Qs

Preconstruction Activities Quiz

Preconstruction Activities Quiz

12th Grade

12 Qs

CONVENTIONAL ECONOMIC SYSTEMS

CONVENTIONAL ECONOMIC SYSTEMS

12th Grade

15 Qs

S2 PMW - Assembly

S2 PMW - Assembly

11th Grade - University

6 Qs

Homes of the Future Quiz

Homes of the Future Quiz

9th - 12th Grade

15 Qs

LIFE SKILLS AND ARCHITECTURE

LIFE SKILLS AND ARCHITECTURE

KG - Professional Development

8 Qs

Electric Lamps Quiz

Electric Lamps Quiz

3rd Grade - University

10 Qs

Business Essentials 2.05

Business Essentials 2.05

9th - 12th Grade

10 Qs

Estimating and Costing Quiz

Estimating and Costing Quiz

Assessment

Quiz

Architecture

12th Grade

Hard

Created by

Harun Gathiaka

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of a quantity surveyor during the pre-construction period?

Preliminary estimates of the project

Valuation of variation

Preparation of final account

Development of building concepts

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a bill of quantities?

Helps in cost analysis and cost planning

Helps in selecting competitive bidders

Helps in preparation of final payment certificates

Helps in developing building concepts

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum percentage of retention money in large contracts?

5%

8%

10%

2%

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an interim payment certificate?

To commission the project

To prepare the final account

To enable the contractor to get paid for work done during the project time

To release the final payment to the contractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the method commonly used for preparing payment certificates?

By estimation

Stage by stage

Minimum payment

By calendar

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of approximate estimation in construction?

To produce a focus of the possible or probable cost of a project before the building is designed in detail

To determine the exact cost of a project after the building is completed

To compare the cost of different construction materials

To calculate the cost of labor for a construction project

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What factors should be considered when choosing the method of approximate estimating to use?

Information available, available time, degree of accuracy, experience of the estimator

Type of soil, form of construction, circulation space, maintenance services

Site location, market conditions, tendering procedures, financial conditions

Size of the structure, plan shape, wall/floor area ratio, storey height/overall heights

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?