1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The project you are managing has 5 stakeholders.

How many channel of communications are there between these stakeholders?

9
8
25
10

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which risk management process is a determination to transfer a risk made?

Identify Risks
Perform Quantitative Risk Analysis
Plan Risk Response
Monitor and Control Risks

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When control charts are used, outliers are:

Singular measurements outside the bandwidth between an upper and lower control limit.
A typical result of a rare random cause which is diffilcult to replicate and to verify.
Insignificant results, often measurement errors,the causes of which should not be further investigated.
Measurements are inconsistent with a run of 7 results over or under a mean value.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Describes the processes concerned with conducting risk management on a project.

Quality Management
Risk Management
Communications Management
Human Resource Management

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The project sponsor asks for a copy of the document that contains the description, owner, source, priority, and status of product requirements.

Which project document is the question?

The scope management plan
The requirements traceability matrix
The project charter
The work breakdown structure (WBS)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As part of preparing the communications management plan for a project in construction, you want to determine the needs of the project stakeholders with respect to information. Your focus is on the type and format of information required to pass on to them.

What is your best course of action?

Conduct a communication requirements analysis
Consult the stakeholder engagement plan
Develop the stakeholder register
Review the requirements documentation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A team is using a fishbone diagram to help determine what quality standards will be used on the project.

What part of the quality management process are they in?

Perform quality control
Perform quality assurance
Plan Quality Management
Variable analysis

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?