Search Header Logo

Chapter 9: Footings & Foundations - Know and Understand

Authored by AJ Adame

Design

12th Grade

Used 3+ times

Chapter 9: Footings & Foundations - Know and Understand
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grading may be needed before building lines are laid out.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is best to locate building lines with a builder’s level, transit, or _____.

autolevel

laser level

theodolite

total station

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A residence may need as much as 8′ to _____ of clearance for batter boards.

10

4

3

15

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Building sites on steep slopes or rugged terrain should be rough-graded before the building is laid out.

true

false

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The highest point on the perimeter of an excavation is known as the _____.

grade level

control point

grade point

building line

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt


  1. IRC now allows frost-protected shallow foundations that are only _____″ below grade.

6

12

16

36

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A _____ footing is one that changes grade levels at intervals to accommodate a sloping lot.

spread

plain

reinforced

stepped

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?