Introduction to Construction Final Exam

Introduction to Construction Final Exam

50 Qs

quiz-placeholder

Similar activities

G6 3.1

G6 3.1

KG - University

45 Qs

Asesmen seni semester 1 2024

Asesmen seni semester 1 2024

KG - University

52 Qs

Latihan PAS Bahasa Indonesia Kelas 7

Latihan PAS Bahasa Indonesia Kelas 7

KG - University

50 Qs

7.4 PA STEELS  Assessment: Matter Cycling & Photosynthesis

7.4 PA STEELS Assessment: Matter Cycling & Photosynthesis

8th Grade

53 Qs

PAS BAHASA INGGRIS KELAS XI

PAS BAHASA INGGRIS KELAS XI

KG - University

50 Qs

USBD TARIKH K.XII

USBD TARIKH K.XII

KG - University

50 Qs

Duplicate of Quid Day 2022

Duplicate of Quid Day 2022

KG - University

47 Qs

Introduction to Construction Final Exam

Introduction to Construction Final Exam

Assessment

Quiz

others

Practice Problem

Hard

Created by

Tamela Brihm

Used 13+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which of the following operations would normally be done using a pneumatic stapler rather than a nailer?

Constructing cabinets
Installing finish work
Installing framing
Installing insulation

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Specifications do all of the following except _____.

serve as a guide for compliance with building codes
define materials to be used
clarify information that cannot be shown on the drawings
replace the drawing notes

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Media Image

The dimension marked F in the figure represents a measurement made from _____.

outside to center
center to center
outside to outside
wall to wall

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Media Image

The electrical symbol marked C in the figure represents a _____.

single-pole switch
triplex receptacle
three-way switch
double-pole switch

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Media Image

The material symbol marked A in the figure represents _____.

insulation
concrete
wood
stone

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Media Image

The plumbing symbol marked D in the figure represents a _____.

hose bib
wall-hung toilet
shower
sink

7.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Media Image

The HVAC symbol marked E in the figure represents a _____.

cold air return duct
wall supply outlet
warm air duct
louver opening

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?