Search Header Logo

4.01-4.03 Ag Mechanics 1

Authored by Bryant Glover

Architecture

12th Grade

Used 4+ times

4.01-4.03 Ag Mechanics 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

23 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

When laying out a building, taking two equal measurements of the diagonal corners means that the four corners are:

A

B

C

D

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When one fails to hold the leveling rod up straight, the measurement will be:

A

B

C

D

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

To be certain that accurate readings are taken, the bubble in the leveling vial of a farm level should be checked:

A

B

C

D

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If Steve is using a builder's level to lay out a building, the degree reading when the telescope is turned to mark a corner should be:

A

B

C

D

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When setting up a tripod and a builder's level, the leveling screws should be adjusted until the:

A

B

C

D

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If Abby needs to lay out a building using the 3-4-5 method, what measurement is used with 24' and 30' to make a square corner?

18'

24'

30'

60'

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The person using a laser beam level for surveying knows that the receiver is on the same grade when a signal is seen or heard from the:

A lower sensor.

B middle sensor.

C rod person.

D top sensor.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?