1.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
When laying out a building, taking two equal measurements of the diagonal corners means that the four corners are:
not plumb
not square
square
triangles
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When one fails to hold the leveling rod up straight, the measurement will be:
accurate
inaccurate
too short
too small
3.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
To be certain that accurate readings are taken, the bubble in the leveling vial of a farm level should be checked:
after each reading
before and after each reading
every hour
once a day
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If Steve is using a builder's level to lay out a building, the degree reading when the telescope is turned to mark a corner should be:
15 degree
30 degree
45 degree
90 degree
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When setting up a tripod and a builder's level, the leveling screws should be adjusted until the:
bubble is centered
leveling rod is level
plumb bob hits the ground
tripod is level
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If Abby needs to lay out a building using the 3-4-5 method, what measurement is used with 24' and 30' to make a square corner?
18'
24'
30'
60'
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The person using a laser beam level for surveying knows that the receiver is on the same grade when a signal is seen or heard from the:
A lower sensor.
B middle sensor.
C rod person.
D top sensor.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?