Renewable Energy EX 1

Renewable Energy EX 1

Professional Development

9 Qs

quiz-placeholder

Similar activities

ACC 106_Symbols Review

ACC 106_Symbols Review

University - Professional Development

10 Qs

Frontier euro 6

Frontier euro 6

Professional Development

10 Qs

Choke Control Panel

Choke Control Panel

Professional Development

10 Qs

CBS Finance TownHall December 2021

CBS Finance TownHall December 2021

KG - Professional Development

10 Qs

QA Knowledge test

QA Knowledge test

Professional Development

12 Qs

Project Finance

Project Finance

Professional Development

10 Qs

Pengenalan NEM

Pengenalan NEM

Professional Development

5 Qs

RBS Cycle: Sesi 2

RBS Cycle: Sesi 2

Professional Development

5 Qs

Renewable Energy EX 1

Renewable Energy EX 1

Assessment

Quiz

Business

Professional Development

Easy

Created by

Walid Osama

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Largest Solar Energy project in Egypt as of date is located in……..

  1. Benban Aswan

  1. Zaafarana Suez

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Off-Grid location means that this location is……..

  1. Connected to the National Grid.

  1. Uses heat as a source of energy.

  1. Not connected to the National Grid.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Net Metering mechanism is allowed for projects…….. 

  1. Above 30 MW.

  1. Below 20 MW.

  1. Below 40 MW.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

……mechanism allows the energy produced to be transferred from place to another via the grid:

  1. Net Metering.

  1. Wheeling.

  1. EPC.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PPA stands for…….

  1. Power Plant Allocation.

  1. Power Producing Asset.

  1. Power Purchase Agreement.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PPA tenor can reach up to……..years 

  1. 10

  1. 20

  1. 30

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PPA can serve…... 

  1. Public sector Off-takers only.

  1. Both Public & Private sector Off-takers.

  1. Private sector Off-takers only.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

……is % of energy availed that must be paid for by the off-taker, whether it was consumed or not.

  1. Off-take agreement.

  1. Produced Energy.

  1. Minimum Off-take.

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Gensets & Batteries are very important for….

  1. Off-Grid locations.

  1. On-Grid locations.

  1. Both On-Grid & Off-Grid locations.