TNB SCADA Migration
Authored by ikhmal azman
Other
Professional Development
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
7 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of ADMS Telecontrol Gateway?
Serial to ethernet converter
Serial to SCADA converter
Serial to master converter
Serial to wireless converter
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is the first site of ADMS TCG installation including the first serial splitter site?
NLDC Bangsar
NERCC Seberang Jaya
PRCC Bayan Lepas
Subang Square
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How is the DiMM for IEC104 being implemented to ensure that ADMS received the data between existing RTU and existing SCADA master?
Using serial splitter
Using Y cable
Using port mirroring
Using switch to switch jumper
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many total ADMS TCG sites are there?
34
36
38
32
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does FEP stands for in ADMS SCADA architecture?
Front End Processor
Front End Programmer
Forward End Processsor
First Entry Processor
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the 2 phases in the ADMS SCADA migration?
Dual inline Master Mimic and Parallel Run
Dual inline Master Monitoring and Parallel Run
Dual inline Master Monitoring and Perpendicular Run
Dual inline Master-Master and Parallel Run
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the name of the functionality in ADMS which enables analysis of SCADA data going through the FEP?
Program Analyzer
SCADA Analyzer
Protocol Analyzer
Protocol Verifier
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
Already have an account?