What is the main goal of dewatering in underwater construction?

Underwater Construction Quiz

Quiz
•
Architecture
•
9th Grade
•
Hard
Jennifer Bertke
FREE Resource
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To create a barrier from the water
To build actual dams
To allow construction to happen safely in areas that would otherwise be infeasible or impossible to build because of water
To divert the normal river flows around the construction site
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a cofferdam?
A type of underwater vehicle
A temporary structure built to hold water back from a construction site
A tool used for welding underwater
A type of remote vehicle used for underwater construction
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a pneumatic caisson in underwater construction?
To divert the normal river flows around the construction site
To balance pressure from the water below and avoid seepage and soil instability
To allow construction to happen safely in areas that would otherwise be infeasible or impossible to build because of water
To create a barrier from the water
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main advantage of using drilled shafts in underwater construction?
They can be used to divert river flows
They do not require any dewatering
They are easier to dismantle and remove after construction
They are cheaper than other construction methods
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a tremie in underwater construction?
To prevent the water from washing away the aggregate and diluting the cement
To allow construction to happen safely in areas that would otherwise be infeasible or impossible to build because of water
To divert the normal river flows around the construction site
To create a barrier from the water
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main use of sheet piles in underwater construction?
To allow construction to happen safely in areas that would otherwise be infeasible or impossible to build because of water
To create a barrier from the water
To drive into the subsurface soils using a huge hammer to create a watertight barrier
To divert the normal river flows around the construction site
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a caisson in underwater construction?
To balance pressure from the water below and avoid seepage and soil instability
To divert the normal river flows around the construction site
To allow construction to happen safely in areas that would otherwise be infeasible or impossible to build because of water
To create a barrier from the water
Create a free account and access millions of resources
Similar Resources on Quizizz
15 questions
Building Laws Quiz 1- PD 1096

Quiz
•
KG - Professional Dev...
20 questions
(15) Hour Blueprint Reading Test

Quiz
•
9th - 12th Grade
11 questions
MineCraft Building and Design Quiz

Quiz
•
9th Grade
16 questions
1995 CSI Masterformat - 01

Quiz
•
7th Grade - Professio...
20 questions
Architecture Alex

Quiz
•
9th - 12th Grade
10 questions
Planning the Sleeping Area

Quiz
•
9th - 12th Grade
10 questions
Prelim, Prime Cost, Prov Sum and Pro Rata

Quiz
•
9th Grade - University
10 questions
Architectural Line Types

Quiz
•
9th - 12th Grade
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
20 questions
Math Review - Grade 6

Quiz
•
6th Grade
20 questions
math review

Quiz
•
4th Grade
5 questions
capitalization in sentences

Quiz
•
5th - 8th Grade
10 questions
Juneteenth History and Significance

Interactive video
•
5th - 8th Grade
15 questions
Adding and Subtracting Fractions

Quiz
•
5th Grade
10 questions
R2H Day One Internship Expectation Review Guidelines

Quiz
•
Professional Development
12 questions
Dividing Fractions

Quiz
•
6th Grade
Discover more resources for Architecture
25 questions
Spanish preterite verbs (irregular/changed)

Quiz
•
9th - 10th Grade
10 questions
Identify Slope and y-intercept (from equation)

Quiz
•
8th - 9th Grade
10 questions
Juneteenth: History and Significance

Interactive video
•
7th - 12th Grade
8 questions
"Keeping the City of Venice Afloat" - STAAR Bootcamp, Day 1

Quiz
•
9th - 12th Grade
26 questions
June 19th

Quiz
•
4th - 9th Grade
27 questions
STAAR English 1 Review

Quiz
•
9th Grade
20 questions
Understanding Linear Equations and Slopes

Quiz
•
9th - 12th Grade