Open House - Quiz

Open House - Quiz

1st Grade

9 Qs

quiz-placeholder

Similar activities

London quiz

London quiz

KG - 1st Grade

10 Qs

pl and sl word blends

pl and sl word blends

KG - 1st Grade

10 Qs

ed, et, en word family

ed, et, en word family

1st - 3rd Grade

12 Qs

the profession of a builder in 100 years

the profession of a builder in 100 years

1st - 5th Grade

10 Qs

WHO AM I 3

WHO AM I 3

1st - 5th Grade

10 Qs

ATM

ATM

1st Grade

10 Qs

Fichas y construcciones

Fichas y construcciones

1st - 5th Grade

10 Qs

FDT new - từ vựng LC L7

FDT new - từ vựng LC L7

1st Grade - University

12 Qs

Open House - Quiz

Open House - Quiz

Assessment

Quiz

English

1st Grade

Hard

Created by

Sir yeo

Used 2+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is IPD?

Integrated Project & Design

Integrated Planning & Design

Integrated Project Delivery

Individual Project & Design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is AMA?

Advanced Manufacturing & Assembly

Automatic Manufacturing & Assembly

Advanced Manufacturing & Automation

Advanced Mechanical & Assembly

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is SUS?

Sustainable Urban Systems

Social Urban Systems

Singapore Urban Systems

Sustainable Universal Systems

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The 16-storey building tower is a SLEB.

What is SLEB?

Super Low Energy Building (SLEB)

Single Low Emission Building (SLEB)

Super Low Emission Building (SLEB)

Single Load Energy Building (SLEB)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The advantage of AMA are shorter construction period, improved workmanship, less disruption & a lot less rework. APCS was used for the 16-Storey high rise building. What is ACPS?

Automatic Precast Concrete System

Advanced Precast Concrete System

Advanced Prototype Construction System

Asymmetric Prototype Construction System

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PPVC was used for the 16-Storey high rise building. What is PPVC?

Prefabricated Prefinished Volumetric Construction

Precast Prefinished Volumetric Construction

Prefabricated Precast Volumetric Construction

Prefabricated Prefinished Volumetric Concrete

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many MET components were used for the 7-Storey ZEB?

500 MET components

600 MET components

800 MET components

1000 MET components

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is ZEB ?

Zero Energy Building

Zero Emission Building

Zero Experiment Building

Zero Energy Builder

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MET allowed for construction without extensive machineries, scaffoldings and props.

What is the reduced site manpower requirement using MET?

80% (10 men vs 80 men conventional)

60% (10 men vs 60 men conventional)

50% (10 men vs 50 men conventional)

30% (10 men vs 30 men conventional)